Mission Operations Days: 2004/066 to 2004/072
March 06, 2004 00:00:00 GMT to March 12, 2004 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, March 6, 2004
None
Sunday, March 7, 2004
None
Monday, March 8, 2004
None
Tuesday, March 9, 2004
None
Wednesday, March 10, 2004
None
Thursday, March 11, 2004
None
Friday, March 12, 2004
None
This Week's Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for March include Door Table Dumps, biweekly SDSM, monthly SRCA Full Radiometric, and bimonthly SRCA Full Spatial calibrations.
Maneuvers:
The next Aqua MODIS Lunar Calibration Roll will be scheduled for 2004/092 (April 1, 2004). Data collect time is 02:44:25 to 02:50:52 GMT. The roll angle will be -12.1168 degrees. The roll will occur 9 hours after the IAM#2 (see below).
The second Aqua Inclination Adjust Maneuver (IAM#2) has been rescheduled to 2004/091 (March 31, 2004), between 15:11:00 and 15:42:21 GMT. The maneuver will consist of a -79.2 degree yaw and a 600-second thruster burn. All of the maneuver will be completed in Spacecraft Night.
No official date has yet been scheduled for the Aqua Deep Space Calibration pitch maneuver(s).
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 229.2 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 195.3 of 500 hours
SRCA 10W Lamp #4: 68.4 of 500 hours
SRCA 1W Lamp #1: 507.0 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours
Solar Diffuser Door: 2176 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements