Skip to main content

MCST Banner Image

pm1weekly_2019-355_2019-361

MODIS IOT Aqua Weekly Report
Mission Operations Days: 2019/355 through 2019/361
December 21, 2019 00:00:00 GMT to December 27, 2019 23:59:59 GMT

Aqua Spacecraft and MODIS Instrument Status:
 

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off
  • 10W Lamps - 1 (functional)
  • 10W Lamps - 2, 3, 4 (non-functional)
  • 1W Lamps - 1, 2 (functional)
Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None

Nominal Science Mode

 Saturday, December 21, 2019
---
None

Sunday, December 22, 2019
----
None

Monday, December 23, 2019
---
None

Tuesday, December 24, 2019
---
None

Wednesday, December 25, 2019
---
None

Thursday, December 26, 2019
---
None

Friday, December 27, 2019
---
None

This Week's Scheduled MODIS Activities Not Completed:
---
None

This Month's Upcoming MODIS Events:
---
December's routine activities include an SRCA Spatial on 2019/337, an SRCA Radiometric on 2019/338, a Lunar Roll on 2019/341, an SDSM_Closed on 2019/343, an SDSM_closed on 2019/364, and an SDSM_Open on 2019/364.

Non-routine activities include a Lunar_Roll on 2019/341.

Monday, December 30, 2019
---
2019/364 21:22:33-21:36:31 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side

2019/364 23:01:26-23:15:24 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open - B-Side

Maneuvers:
---
Aqua DMU #144 took place on 2019/339.
Aqua Lunar Roll took place on 2019/341.

MODIS Anomalies:
---
None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival
heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss
records) can be found at the following URL. Note that a password is now
required to access the EOS mission links web pages. There are directions
at the URL below for how to obtain a username/password.

https://wapub32.eos.nasa.gov/

Limited Life Item Status:

SRCA 10W Lamp #1: 373.8 of 500 hours
SRCA 10W Lamp #2: 188.1 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 135.0 of 500 hours

SRCA 1W Lamp #1: 531.7 of 5000 hours
SRCA 1W Lamp #2: 303.9 of 5000 hours

Solar Diffuser Door: 3552 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements