Terra Spacecraft and MODIS Instrument Status:

Terra (AM-1) is in Normal Ops Mode
MODIS is in Science Mode - A Side
MODIS has no known Anomalies
Component State(s) Comment
Blackbody A On (270 K); B Off Nominal
Calibration Electronics A On; B Off Nominal
Control Processor A On; B Off Nominal
Nadir Door Unlatched, Open Nominal
Space View Door Unlatched, Open Nominal
Solar Diffuser Door Unlatched, Closed Nominal
FDDI Formatter A On; B Off Nominal
FDDI Port A On; B Off Nominal
FIFO Memory #1 & #2 On; #3 & #4 Off Nominal
Format Processor A On; B Off Nominal
Power Supplies #1 On, #2 Off Nominal
PV VIS FPA A On; B Off Nominal
PV NIR FPA A On; B Off Nominal
PV SMIR FPA A On; B Off Nominal
PV LWIR FPA A On; B Off Nominal
PC LWIR FPA A On; B Off Nominal
RC Outgas Heaters All Off (CS, IS, OS) Nominal
RC LWIR FPA Heater On (83 K) Nominal
RC SMIR FPA Heater Off Nominal
Scan Assembly A On; B Off Nominal
SDSM A Off; B Off Nominal
SRCA A Off; B Off Nominal
PS1 Survival Heater Enabled Nominal
PS2 Survival Heater Enabled Nominal
Timing Generator A On; B Off Nominal
Flight Software Rev BD Nominal
Inhibit Ids Set None Nominal
TMONs Enabled 66, 67 Nominal

This Week’s Completed MODIS Activities:

Friday, March 3, 2000

2000/063 23:47:45 ATC – OA16: SD/SDSM Screened Double

Saturday, March 4, 2000

2000/064 06:23:16 ATC – OA15: SD/SDSM Open Double
2000/064 12:58:46 ATC – OA16: SD/SDSM Screened Double
2000/064 13:20:53 Real-time – Set SMIR Itwk / Vdet to 110 / 224
2000/064 13:21:45 Real-time – Set Blackbody duty cycle to 100%
2000/064 13:23:13 Real-time – Set Blackbody temperature to 315K
2000/064 19:34:17 ATC – OA16: SD/SDSM Screened Double
2000/064 22:51:55 ATC – Formatter to Day Rate (13:56 earlier than Nadir Term. Crossing) This allows for all Bands to be recorded for the following activities.
2000/064 22:51:57 ATC – PC DC Restore OFF
2000/064 22:51:59 ATC – PV DC Restore OFF
2000/064 22:52:01 ATC – Sector Rotation to –3400
2000/064 22:52:03 ATC – OA16: SD/SDSM Screened Double
2000/064 23:09:58 ATC – Sector Rotation to 0
2000/064 23:10:00 ATC – PV DC Restore ON
2000/064 23:10:02 ATC – PC DC Restore ON
2000/064 23:10:04 ATC – Formatter to Night Rate (to make up for earlier Day extension)
2000/064 23:10:04 ATC – Formatter to Day Rate (Back on track for nominal rate modes)
2000/064 23:36:00 Real-time – Set Blackbody temperature to 270K

Sunday, March 5, 2000

2000/065 03:48:50 ATC – OA15: SD/SDSM Open Double
2000/065 08:45:19 ATC – OA16: SD/SDSM Screened Double
2000/065 13:41:56 ATC – OA16: SD/SDSM Screened Double
2000/065 18:38:35 ATC – OA15: SD/SDSM Open Double
2000/065 19:13:10 Real-time – Set SMIR Itwk / Vdet to 110 / 228
2000/065 19:14:41 Real-time – Set Blackbody temperature to 315K

Monday, March 6, 2000

2000/066 00:00:00 Real-time – Set Blackbody temperature to 270K
2000/066 00:01:10 Real-time – Set Blackbody duty cycle to 33%
2000/066 06:10:43 ATC – OA16: SD/SDSM Screened Double
2000/066 11:07:21 ATC – OA16: SD/SDSM Screened Double
2000/066 12:02:34 ATC – OA19: SRCA Full Radiometric
2000/066 12:46:14 ATC – OA15: SD/SDSM Open Double
2000/066 17:12:55 Real-time – Set SMIR Itwk / Vdet to 110 / 226
2000/066 21:00:37 ATC – OA16: SD/SDSM Screened Double

Tuesday, March 7, 2000

2000/067 03:36:08 ATC – OA15: SD/SDSM Open Double
2000/067 08:32:46 ATC – OA16: SD/SDSM Screened Double
2000/067 10:11:38 ATC – OA16: SD/SDSM Screened Double
2000/067 11:00:00 ATC – OA26: Set Blackbody to 285K
2000/067 13:00:00 ATC – OA26: Set Blackbody to 290K
2000/067 14:45:30 Real-time – Set Blackbody duty cycle to 100%
2000/067 15:00:00 ATC – OA26: Set Blackbody to 295K
2000/067 17:00:00 ATC – OA26: Set Blackbody to 300K
2000/067 19:29:00 Real-time – Set Blackbody temperature to 270K
2000/067 19:30:00 Real-time – Set Blackbody duty cycle to 33%
2000/067 20:04:56 ATC – OA15: SD/SDSM Open Double

Wednesday, March 8, 2000

2000/068 02:40:24 ATC – OA16: SD/SDSM Screened Double
2000/068 09:15:54 ATC – OA16: SD/SDSM Screened Double
2000/068 11:50:01 ATC – OA23: SRCA Full Spatial
2000/068 14:12:23 ATC – OA15: SD/SDSM Open Double
2000/068 18:48:29 Real-time Turn on A-side Blackbody
2000/068 18:50:14 Real-time Set Blackbody to 290K
2000/068 20:48:03 ATC – OA16: SD/SDSM Screened Double

Thursday, March 9, 2000

2000/069 00:05:49 ATC – OA16: SD/SDSM Screened Double
2000/069 03:23:34 ATC – OA15: SD/SDSM Open Double
2000/069 14:49:02 Real-time Set Blackbody to 315K
2000/069 14:49:53 Real-time Set Blackbody Duty Cycle to 100%
2000/069 21:31:16 ATC – OA16: SD/SDSM Screened Double
2000/069 21:50:43 Real-time Set Blackbody to 270K
2000/069 21:51:34 Real-time Set Blackbody Duty Cycle to 33%
2000/069 23:10:09 ATC – OA16: SD/SDSM Screened Double

Friday, March 10, 2000

2000/070 04:06:48 ATC – OA15: SD/SDSM Open Double
2000/070 09:03:26 ATC – OA16: SD/SDSM Screened Double
2000/070 09:55:34 ATC – OA22: SRCA Spectral Part 1 (30W)
2000/070 11:50:18 ATC – OA22: SRCA Spectral Part 2 (30W)
2000/070 13:12:44 ATC – OA22: SRCA Spectral Part 3 (10W)
2000/070 15:08:04 ATC – OA22: SRCA Spectral Part 4 (10W)
2000/070 15:52:12-16:04:20 Real-time Ecal Sweep; Vcal starts 48,43,53,60 8 Vcal steps of 1 DN, Nstep of 20,20,20,8
2000/070 17:40:12-17:52:05 Real-time Ecal Sweep; Vcal starts 48,43,53,60 8 Vcal steps of 1 DN, Nstep of 18,18,18,6
2000/070 18:56:44 ATC – OA16: SD/SDSM Screened Double

This Week's Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Friday, March 10, 2000

2000/070 20:11:00 – 20:22:49 Real-time Ecal Sweep; Vcal starts 48,43,53,60 8 Vcal steps of 1 DN, Nstep of 22,22,22,10
2000/070 21:39:23 Real-time - Set new gain changes for bands 5, 14H, and 16
2000/070 21:59:17 Real-time - Set Blackbody to 290K
2000/070 22:14:29 ATC – OA15: SD/SDSM Open Double

Saturday, March 11, 2000

2000/071 03:11:08 ATC – OA16: SD/SDSM Screened Double
2000/071 08:07:46 ATC – OA16: SD/SDSM Screened Double
2000/071 13:04:25 ATC – OA15: SD/SDSM Open Double
2000/071 16:35:43 – 16:42:11 ATC – OA14:Sector Rotation for entire cavity (DCR Off) Deltas of 0, 1776, 4711, 5643, & 6842
2000/071 18:00:04 ATC – OA16: SD/SDSM Screened Double

Sunday, March 12, 2000

2000/072 03:54:06 ATC – OA16: SD/SDSM Screened Double
2000/072 08:50:44 ATC – OA15: SD/SDSM Open Double
2000/072 15:26:14 ATC – OA16: SD/SDSM Screened Double
2000/072 20:23:52 ATC – OA16: SD/SDSM Screened Double
2000/072 ??? Real-time Ecal Sweep; Vcal starts 48,43,53,60 8 Vcal steps of 1 DN, Nstep of 20,20,20,8
2000/072 ??? Real-time Ecal Sweep; Vcal starts 48,43,53,60 8 Vcal steps of 1 DN, Nstep of 18,18,18,6
2000/072 ??? Real-time Ecal Sweep; Vcal starts 48,43,53,60 8 Vcal steps of 1 DN, Nstep of 22,22,22,10

Monday, March 13, 2000

2000/073 01:19:29 ATC – OA16: SD/SDSM Screened Double
2000/073 02:14:40 ATC – OA19: SRCA Full Radiometric
2000/073 04:37:14 ATC – OA15: SD/SDSM Open Double
2000/073 07:54:59 ATC – OA15: SD/SDSM Screened Double
2000/073 11:12:44 ATC – OA15: SD/SDSM Screened Double
2000/073 13:54:52 – 15:33:45 ATC – OA24: SRCA 10W Radiometric (Rad Feedback Mode)
2000/073 20:30:23 – 22:09:15 ATC – OA24: SRCA 10W Radiometric (Constant Current Mode)

Tuesday, March 14, 2000

2000/074 00:23:45 ATC – OA15: SD/SDSM Open Double
2000/074 01:00:00 Real-time Set Blackbody to 270K
2000/074 03:05:53 – 04:44:45 ATC – OA25: SRCA 1W Radiometric
2000/074 05:20:22 ATC – OA16: SD/SDSM Screened Double
2000/074 15:00:00 ATC - Set Blackbody to 315K
2000/074 15:00??? Real-time Set Blackbody duty cycle to 100%
2000/074 16:52:30 ATC – OA16: SD/SDSM Screened Double
2000/074 18:31:22 ATC – OA15: SD/SDSM Open Double
2000/074 20:38:52 Drag Make-up Maneuver – less than 20 seconds long
2000/074 22:00:00 ATC – Set Blackbody to 270K
2000/074 22:00??? Real-time Set Blackbody duty cycle to 33%

Wednesday, March 15, 2000

2000/075 02:45:46 ATC – OA16: SD/SDSM Screened Double
2000/075 07:42:25 ATC – OA16: SD/SDSM Screened Double
2000/075 12:42:52 ATC – OA15: SD/SDSM Open Double
2000/075 15:05:19 – 16:02:50 ATC – OA23: SRCA Full Spatial
2000/075 19:14:36 ATC – OA16: SD/SDSM Screened Double

Thursday, March 16, 2000

2000/076 07:00 ATC – Blackbody to 280K
2000/076 12:00 ATC – Blackbody to 285K
2000/076 15:00 ATC – Blackbody to 290K
2000/076 15:?? Real-time – Set Blackbody duty cycle to 100%
2000/076 17:00 ATC – Blackbody to 295K
2000/076 19:00 ATC – Blackbody to 300K
2000/076 21:00 ATC – Blackbody to 270K
2000/076 21:?? ATC – Blackbody to 33%
2000/076 ATC – OA16: SD/SDSM Screened Double
2000/076 ATC – OA15: SD/SDSM Open Double
2000/076 ATC – OA16: SD/SDSM Screened Double
2000/076 ATC – OA16: SD/SDSM Screened Double
2000/076 ATC – OA15: SD/SDSM Open Double

Friday, March 17, 2000

2000/077 Real-time Set Blackbody to 290K
2000/077 ATC – OA16: SD/SDSM Screened Double
2000/077 ATC – OA16: SD/SDSM Screened Double
2000/077 ATC – OA22: SRCA Full Spectral
2000/077 ATC – OA15: SD/SDSM Open Double
2000/077 ATC – OA16: SD/SDSM Screened Double

Saturday, March 18, 2000

2000/078 ATC – OA16: SD/SDSM Screened Double
2000/078 ATC – OA15: SD/SDSM Open Double
2000/078 ATC – OA16: SD/SDSM Screened Double
2000/078 ATC – OA16: SD/SDSM Screened Double

Wed, March 15, 2000 - IRU Yaw and Roll Slews
Thus, March 16, 2000 - FSS Yaw and Roll Slews
Wed, March 22, 2000 - Drag Makeup Maneuver
Fri, March 24, 2000 - MODIS Roll Maneuver (-19 deg)
Sat, April 25, 2000 - MODIS Yaw Maneuvers
Sun, April 26, 2000 - MODIS Yaw Maneuvers
Mon, April 27, 2000 - Inclination Maneuver
Tue, April 28, 2000 - Post-inclination Drag Makeup Maneuver

MODIS Anomalies:

None.

General Instrument Comments:

MODIS is in Science Mode on the A-side with the SVD and NAD open. Functional checkout of MODIS is complete and was successful. All mechanisms behaved nominally.

MODIS Telemetry Trends:

Telemetry is nominal.

Non-MODIS Significant Events:

The transition to normal operations continues as the FOT has begun running our morning status meeting as Project Leads begin the handover.

Limited Life Item Status:

SRCA 10W Lamp #1: 142.8 of 500 hours
SRCA 10W Lamp #2: 124.0 of 500 hours
SRCA 10W Lamp #3: 133.2 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours

SRCA 1W Lamp #1: 543.8 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours

Solar Diffuser Door: 1121 of 3022 Movements
Nadir Aperture Door: 530 of 1316 Movements
Space View Door: 436 of 1316 Movements