Mission Operations Days: 2000/309 to 2000/315
November 04, 2000 00:00:00 GMT to November 10, 2000 00:00:00 GMT
Terra Spacecraft and MODIS Instrument Status:
Terra (AM-1) is in Normal Ops Mode MODIS is in Science Mode - B Side |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (290 K) | Nominal |
Calibration Electronics | A Off; B On | Nominal |
Control Processor | A Off; B On | Nominal |
Nadir Door | Unlatched, Open | Nominal |
Space View Door | Unlatched, Open | Nominal |
Solar Diffuser Door | Unlatched, Closed | Nominal |
FDDI Formatter | A Off; B On | Nominal |
FDDI Port | A On; B Off | Nominal |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal |
Format Processor | A Off; B On | Nominal |
Power Supplies | #1 Off; #2 On | Nominal |
PV VIS FPA | A Off; B On | Nominal |
PV NIR FPA | A Off; B On | Nominal |
PV SMIR FPA | A Off; B On | Nominal |
PV LWIR FPA | A Off; B On | Nominal |
PC LWIR FPA | A Off; B On | Nominal |
RC Outgas Heaters | All Off (CS, IS, OS) | Nominal |
RC LWIR FPA Heater | On (83 K) | Nominal |
RC SMIR FPA Heater | Off | Nominal |
Scan Assembly | A Off; B On | Nominal |
SDSM | A Off; B Off | Nominal |
SRCA | A Off; B Off | Nominal |
PS1 Survival Heater | Enabled | Nominal |
PS2 Survival Heater | Enabled | Nominal |
Timing Generator | A Off; B On | Nominal |
Flight Software | Rev BD + 1 set of patches
|
Nominal |
Inhibit Ids Set | None | Nominal |
TMONs Enabled | 68 | Nominal |
This Week’s Completed MODIS Activities:
Friday, November 3, 2000
2000/308 21:44:49-22:42:20 ATC OA-23: SRCA Full Spatial
Saturday, November 4, 2000
2000/309 06:14:00-06:31:00 ATC Formatter Day Rate Science Collection during Nadir Ground Track Night. (3+ Granules)
2000/309 21:39:13-21:41:44 ATC OA-27: PV ECAL
2000/309 21:44:13-21:48:44 ATC OA-28: PC ECAL
Sunday, November 5, 2000
None
Monday, November 6, 2000
None
Tuesday, November 7, 2000
None
Wednesday, November 8, 2000
None
Thursday, November 9, 2000
None
Friday, November 10, 2000
None
This Week's Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Friday, November 10, 2000
None
Saturday, November 11, 2000
None
Sunday, November 12, 2000
None
Monday, November 13, 2000
None
Tuesday, November 14, 2000
None
Wednesday, November 15, 2000
Roll Maneuver:
320/22:15:29 ATC Move Formatter to Night ahead by 3:23 to ensure 50/50 day/night
320/22:47:43 ATC Set Formatter to Day Rate
320/22:47:45 ATC Set SCIABNORM Flag to ABNORM
320/22:47:47 ATC PC DC Restore to OFF
320/22:47:49 ATC PV DC Restore to OFF
320/22:47:51 ATC Sector Rotation to -3072 (EA to SV and OBCs)
320/22:54:21 ATC Sector Rotation to Zero (Normal)
320/22:54:23 ATC PC DC Restore to ON
320/22:54:25 ATC PV DC Restore to ON
320/22:54:27 ATC Set SCIABNORM Flag to NORM
320/22:54:29 ATC Set Formatter to Night Rate
320/23:11:41 ATC Move Formatter to Day later by 3:23 to ensure 50/50 day/night
Thursday, November 16, 2000
None
Friday, November 17, 2000
Leonid Meteor shower Nov 17th & 18th: MODIS will remain in nominal B-side science operations, however, all calibration activities will be suspended during this time.
Maneuvers:
Wednesday, November 15, 2000
The next MODIS Roll Maneuver is schedule for DOY 320 22:41:59 to 22:58:59 for a roll angle of -11.5506 degrees.
MODIS Anomalies:
No formatter anomalies have been detected since switching to B-side science operations. The MODIS IOT is continuing to monitor changes with the radiative cooler temperatures and focal plane power.
General Instrument Comments:
MODIS is in Science Mode on the B-side with the SVD and NAD open, operating with the Formatter Resolution Flight Software Patches (FRFSP). No new events have been witnessed by the FRFSP since the B-Side Transition on DOY 304.
MODIS Telemetry Trends:
The Radiative Cooler intermediate stage temperature has slowly been increasing since approximately day 240. During this time the LWIR focal plane heater margin has been decreasing. The IOT is continuing to trend these telemetry mnemonics.
Non-MODIS Significant Events:
None.
Limited Life Item Status:
SRCA 10W Lamp #1: 173.8 of 500 hours SRCA 10W Lamp #2: 136.3 of 500 hours SRCA 10W Lamp #3: 145.5 of 500 hours SRCA 10W Lamp #4: 61.5 of 500 hours
SRCA 1W Lamp #1: 556.1 of 4000 hours SRCA 1W Lamp #2: 276.3 of 4000 hours
Solar Diffuser Door: 1453 of 3022 Movements Nadir Aperture Door: 532 of 1316 Movements Space View Door: 437 of 1316 Movements