NOTE: BAND 5 GAIN CHANGES were temporarily made for 068/16:34:30 – 20:38:34.
******************************************************************

Terra Spacecraft and MODIS Instrument Status:

Terra (AM-1) is in Normal Ops Mode
MODIS is in Science Mode - B Side
Component State(s) Comment
Blackbody A Off; B On (290 K) Nominal
Calibration Electronics A Off; B On Nominal
Control Processor A Off; B On Nominal
Nadir Door Unlatched, Open Nominal
Space View Door Unlatched, Open Nominal
Solar Diffuser Door Unlatched, Closed Nominal
FDDI Formatter A Off; B On Nominal
FDDI Port A On; B Off Nominal
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal
Format Processor A Off; B On Nominal
Power Supplies #1 Off; #2 On Nominal
PV VIS FPA A Off; B On Nominal
PV NIR FPA A Off; B On Nominal
PV SMIR FPA A Off; B On Nominal
PV LWIR FPA A Off; B On Nominal
PC LWIR FPA A Off; B On Nominal
RC Outgas Heaters All Off (CS, IS, OS) Nominal
RC LWIR FPA Heater On (83 K) Nominal
RC SMIR FPA Heater Off Nominal
Scan Assembly A Off; B On Nominal
SDSM A Off; B Off Nominal
SRCA A Off; B Off Nominal
PS1 Survival Heater Enabled Nominal
PS2 Survival Heater Enabled Nominal
Timing Generator A Off; B On Nominal
Flight Software Rev BD + 1 set of patches
  • FR Error Counting and Statistics (2 patches)
Nominal
Inhibit Ids Set None Nominal
TMONs Enabled 68 Nominal

This Week’s Completed MODIS Activities:

Saturday, March 3, 2001

None

Sunday, March 4, 2001

None

Monday, March 5, 2001

2001/064 20:14:55 – MOD_FR_DELAY_CHANGE(‘SR’,0) ran to set the sector delay back to zero from 50.

Tuesday, March 6, 2001

None

Wednesday, March 7, 2001

2001/066 21:16:03 OA-16: SDSM SCREENED
2001/066 22:54:56 OA-15: SDSM OPEN

Thursday, March 8, 2001

2001/067 21:08:05 – 22:05:36 OA-23: SRCA Full Spatial

Friday, March 9, 2001

2001/068 16:34:30 – 16:41:10 B5 Gain change:

Detector From To
1 117 66
2 113 63
3 115 65
4 117 66
5 112 63
6 112 63
7 107 59
8 108 60
9 102 55
10 101 54
11 100 54
12 99 53
13 96 51
14 99 53
15 100 54
16 101 54
17 95 50
18 107 59
19 105 57
20 102 55

2001/068 17:41:48 OA-16: SDSM SCREENED
2001/068 19:20:41 OA-15: SDSM OPEN

2001/068 20:32:07 – 20:38:34 B5 Gain change back:

Detector From To
1 66 117
2 63 113
3 65 115
4 66 117
5 63 112
6 63 112
7 59 107
8 60 108
9 55 102
10 54 101
11 54 100
12 53 99
13 51 96
14 53 99
15 54 100
16 54 101
17 50 95
18 59 107
19 57 105
20 55 102

This Week's Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Saturday, March 10, 2001

None

Sunday, March 11, 2001

None

Monday, March 12, 2001

None

Tuesday, March 13, 2001

072/20:05:20 – 20:25:00 ADC_IRU_TO_HI_RATE
072/21:30:51 ATC Move Formatter to Night ahead by 3:23 to ensure 50/50 day/night
072/21:32:52 FOT ATC commanding: Begin slew to –16.512 degrees
072/21:40:14 ATC Set Formatter to Day Rate
072/21:40:16 ATC Set SCIABNORM Flag to ABNORM
072/21:40:18 ATC PC DC Restore to OFF
072/21:40:20 ATC PV DC Restore to OFF
072/21:40:22 ATC Sector Rotation to –3072 (EA to SV and OBCs)
072/21:46:52 ATC Sector Rotation to Zero (Normal)
072/21:46:54 ATC PV DC Restore to ON
072/21:46:56 ATC PC DC Restore to ON
072/21:46:58 ATC Set SCIABNORM Flag to NORM
072/21:47:00 ATC Set Formatter to Night Rate
072/21:54:40 FOT ATC commanding: Return to nominal attitude
072/21:55:00 – 22:06:00 ADC_IRU_TO_LO_RATE
072/22:27:01 ATC Move Formatter to Day later by 3.23 to ensure 50/50 day/night

Wednesday, March 14, 2001

None

Thursday, March 15, 2001

None

Friday, March 16, 2001

None

Maneuvers:

The next MODIS Roll Maneuver for a Lunar Calibration through the Space View Port is scheduled for March 13th at approx. 21:32:52. The next Drag Makeup Maneuver (delta-V) is scheduled for March 14th at approx. 19:40:00

MODIS Anomalies:

There appears to be a problem processing the science data collected during the SRCA activities on Friday, March 2nd, 2001 (day 061). Specifically, this may be related to the change in sector sizes for the Solar Diffuser and SRCA. If this is the cause, it will affect data from 061/14:06:30 to 061/18:21:56 GMT. This problem is not yet well understood.

The SRCA sector delay was left at a value of 50 (1 frame delay) after the SRCA activities on Friday March 2nd, (day 061). This delay will be changed back to zero on Monday, March 5th. This has no impact to MODIS operations except for SRCA sector data. No SRCA activities will be scheduled until the delay is set to zero. The SRCA crosstalk activities will be corrected and re-CM’d.

General Instrument Comments:

MODIS is in Science Mode on the B-side with the SVD and NAD open, operating with the Formatter Resolution Flight Software Patches (FRFSP).

MODIS Telemetry Trends:

Temperature trends are correlating with the solar beta angle.

Non-MODIS Significant Events:

None

Limited Life Item Status:

SRCA 10W Lamp #1: 182.3 of 500 hours
SRCA 10W Lamp #2: 141.0 of 500 hours
SRCA 10W Lamp #3: 150.2 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours

SRCA 1W Lamp #1: 557.1 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours

Solar Diffuser Door: 1555 of 3022 Movements
Nadir Aperture Door: 532 of 1316 Movements