Terra Spacecraft and MODIS Instrument Status:

Terra (AM-1) is in Normal Ops Mode with SSR supersets 30 and 31 unallocated
MODIS is in Science Mode - B Side
Component State(s) Comment
Blackbody A Off; B On (290 K) Nominal
Calibration Electronics A Off; B On Nominal
Control Processor A Off; B On Nominal
Nadir Door Unlatched, Open Nominal
Space View Door Unlatched, Open Nominal
Solar Diffuser Door Unlatched, Closed Nominal
FDDI Formatter A Off; B On Nominal
FDDI Port A On; B Off Nominal
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal
Format Processor A Off; B On Nominal
Power Supplies #1 Off; #2 On Nominal
PV VIS FPA A Off; B On Nominal
PV NIR FPA A Off; B On Nominal
PV SMIR FPA A Off; B On Nominal
PV LWIR FPA A Off; B On Nominal
PC LWIR FPA A Off; B On Nominal
RC Outgas Heaters All Off (CS, IS, OS) Nominal
RC LWIR FPA Heater On (83 K) Nominal
RC SMIR FPA Heater Off Nominal
Scan Assembly A Off; B On Nominal
SDSM A Off; B Off Nominal
SRCA A Off; B Off Nominal
PS1 Survival Heater Enabled Nominal
PS2 Survival Heater Enabled Nominal
Timing Generator A Off; B On Nominal
Flight Software Rev BD + 2 set of patches
  • FR Error Counting and Statistics (2 patches)
  • FR Band 5 Gain Change (20 commands)
Nominal
Inhibit Ids Set None Nominal
TMONs Enabled 68 Nominal

This Week's Completed MODIS Activities:

Saturday, June 2, 2001

None

Sunday, June 3, 2001

None

Monday, June 4, 2001

None

Tuesday, June 5, 2001

None

Wednesday, June 6, 2001

None

Thursday, June 7, 2001

2001/158 21:27:15 ATC OA-16: SD/SDSM Screened
2001/158 23:06:08 ATC OA-15: SD/SDSM Open

Friday, June 08, 2001

None

This Week's Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Saturday, June 9, 2001

None

Sunday, June 10, 2001

161/21:35?? First attitude disturbances due to config. change for maneuver
161/22:54:37 ATC Move Formatter to Night ahead by 3:23 to ensure 50/50 day/night
161/22:58:54 FOT ATC commanding: Begin slew to -20.0192 degrees
161/23:07:17 ATC Set Formatter to Day Rate
161/23:07:19 ATC Set SCIABNORM Flag to ABNORM
161/23:07:21 ATC PC DC Restore to OFF
161/23:07:23 ATC PV DC Restore to OFF
161/23:07:25 ATC Sector Rotation to -3072 (EA to SV and OBCs)
161/23:13:55 ATC Sector Rotation to Zero (Normal)
161/23:13:57 ATC PV DC Restore to ON
161/23:13:59 ATC PC DC Restore to ON
161/23:14:01 ATC Set SCIABNORM Flag to NORM
161/23:14:03 ATC Set Formatter to Night Rate
161/23:14:35 FOT ATC commanding: Return to nominal attitude
161/23:24?? Final attitude disturbances due to config. change for maneuver
161/23:50:52 ATC Move Formatter to Day later by 3.23 to ensure 50/50 day/night

Monday, June 11, 2001

None

Tuesday, June 12, 2001

None

Wednesday, June 13, 2001

None

Thursday, June 14, 2001

None

Friday, June 15, 2001

None

Based on the current operations plan, calibration activities for June will include an SRCA Full Radiometric, PV Ecal, PC Ecal, and weekly SD/SDSM calibrations.

Maneuvers:

The next MODIS Lunar Roll Maneuver is scheduled for this Sunday, June 10, 2001. The roll angle is -20.0192 degrees with a data collection from 2001/161-23:07:25 to 2001/161-23:13:55.

MODIS Anomalies:

None

General Instrument Comments:

MODIS is in Science Mode on the B-side with the SVD and NAD open, operating with the Formatter Resolution Flight Software Patches (FRFSP).

MODIS Telemetry Trends:

Telemetry is trending nominally. The amount of power required by the focal plane heater to maintain 83.0K is still slowly decreasing, although the spacecraft is currently near the minimum absolute solar beta angle for the year.

Non-MODIS Significant Events:

MOPITT Anomaly:

The MOPITT team is still working to recover their instrument to science operations.

Limited Life Item Status:

SRCA 10W Lamp #1: 186.0 of 500 hours
SRCA 10W Lamp #2: 142.9 of 500 hours
SRCA 10W Lamp #3: 152.1 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours

SRCA 1W Lamp #1: 557.5 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours

Solar Diffuser Door: 1627 of 3022 Movements
Nadir Aperture Door: 532 of 1316 Movements
Space View Door: 437 of 1316 Movements