Mission Operations Days: 2001/153 to 2001/159
June 02, 2001 00:00:00 GMT to June 08, 2001 00:00:00 GMT
Terra Spacecraft and MODIS Instrument Status:
Terra (AM-1) is in Normal Ops Mode with SSR supersets 30 and 31 unallocated MODIS is in Science Mode - B Side |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (290 K) | Nominal |
Calibration Electronics | A Off; B On | Nominal |
Control Processor | A Off; B On | Nominal |
Nadir Door | Unlatched, Open | Nominal |
Space View Door | Unlatched, Open | Nominal |
Solar Diffuser Door | Unlatched, Closed | Nominal |
FDDI Formatter | A Off; B On | Nominal |
FDDI Port | A On; B Off | Nominal |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal |
Format Processor | A Off; B On | Nominal |
Power Supplies | #1 Off; #2 On | Nominal |
PV VIS FPA | A Off; B On | Nominal |
PV NIR FPA | A Off; B On | Nominal |
PV SMIR FPA | A Off; B On | Nominal |
PV LWIR FPA | A Off; B On | Nominal |
PC LWIR FPA | A Off; B On | Nominal |
RC Outgas Heaters | All Off (CS, IS, OS) | Nominal |
RC LWIR FPA Heater | On (83 K) | Nominal |
RC SMIR FPA Heater | Off | Nominal |
Scan Assembly | A Off; B On | Nominal |
SDSM | A Off; B Off | Nominal |
SRCA | A Off; B Off | Nominal |
PS1 Survival Heater | Enabled | Nominal |
PS2 Survival Heater | Enabled | Nominal |
Timing Generator | A Off; B On | Nominal |
Flight Software | Rev BD + 2 set of patches
|
Nominal |
Inhibit Ids Set | None | Nominal |
TMONs Enabled | 68 | Nominal |
This Week's Completed MODIS Activities:
Saturday, June 2, 2001
None
Sunday, June 3, 2001
None
Monday, June 4, 2001
None
Tuesday, June 5, 2001
None
Wednesday, June 6, 2001
None
Thursday, June 7, 2001
2001/158 21:27:15 ATC OA-16: SD/SDSM Screened
2001/158 23:06:08 ATC OA-15: SD/SDSM Open
Friday, June 08, 2001
None
This Week's Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Saturday, June 9, 2001
None
Sunday, June 10, 2001
161/21:35?? First attitude disturbances due to config. change for maneuver
161/22:54:37 ATC Move Formatter to Night ahead by 3:23 to ensure 50/50 day/night
161/22:58:54 FOT ATC commanding: Begin slew to -20.0192 degrees
161/23:07:17 ATC Set Formatter to Day Rate
161/23:07:19 ATC Set SCIABNORM Flag to ABNORM
161/23:07:21 ATC PC DC Restore to OFF
161/23:07:23 ATC PV DC Restore to OFF
161/23:07:25 ATC Sector Rotation to -3072 (EA to SV and OBCs)
161/23:13:55 ATC Sector Rotation to Zero (Normal)
161/23:13:57 ATC PV DC Restore to ON
161/23:13:59 ATC PC DC Restore to ON
161/23:14:01 ATC Set SCIABNORM Flag to NORM
161/23:14:03 ATC Set Formatter to Night Rate
161/23:14:35 FOT ATC commanding: Return to nominal attitude
161/23:24?? Final attitude disturbances due to config. change for maneuver
161/23:50:52 ATC Move Formatter to Day later by 3.23 to ensure 50/50 day/night
Monday, June 11, 2001
None
Tuesday, June 12, 2001
None
Wednesday, June 13, 2001
None
Thursday, June 14, 2001
None
Friday, June 15, 2001
None
Based on the current operations plan, calibration activities for June will include an SRCA Full Radiometric, PV Ecal, PC Ecal, and weekly SD/SDSM calibrations.
Maneuvers:
The next MODIS Lunar Roll Maneuver is scheduled for this Sunday, June 10, 2001. The roll angle is -20.0192 degrees with a data collection from 2001/161-23:07:25 to 2001/161-23:13:55.
MODIS Anomalies:
None
General Instrument Comments:
MODIS is in Science Mode on the B-side with the SVD and NAD open, operating with the Formatter Resolution Flight Software Patches (FRFSP).
MODIS Telemetry Trends:
Telemetry is trending nominally. The amount of power required by the focal plane heater to maintain 83.0K is still slowly decreasing, although the spacecraft is currently near the minimum absolute solar beta angle for the year.
Non-MODIS Significant Events:
MOPITT Anomaly:
The MOPITT team is still working to recover their instrument to science operations.
Limited Life Item Status:
SRCA 10W Lamp #1: 186.0 of 500 hours
SRCA 10W Lamp #2: 142.9 of 500 hours
SRCA 10W Lamp #3: 152.1 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours
SRCA 1W Lamp #1: 557.5 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours
Solar Diffuser Door: 1627 of 3022 Movements
Nadir Aperture Door: 532 of 1316 Movements
Space View Door: 437 of 1316 Movements