Terra Spacecraft and MODIS Instrument Status:

Terra (AM-1) is in Normal Ops Mode
MODIS is in Science Mode - A Side
ComponentState(s)Comment
BlackbodyA On (290 K); B OffNominal
Calibration ElectronicsA On; B OffNominal
Control ProcessorA On; B OffNominal
Nadir DoorUnlatched, OpenNominal
Space View DoorUnlatched, OpenNominal
Solar Diffuser DoorUnlatched, ClosedNominal
FDDI FormatterA On; B OffNominal
FDDI PortA On; B OffNominal
FIFO Memory#1 & #2 On; #3 & #4 OffNominal
Format ProcessorA On; B OffNominal
Power Supplies#1 On; #2 OffNominal
PV VIS FPAA On; B OffNominal
PV NIR FPAA On; B OffNominal
PV SMIR FPAA On; B OffNominal
PV LWIR FPAA On; B OffNominal
PC LWIR FPAA On; B OffNominal
RC Outgas HeatersAll Off (CS, IS, OS)Nominal
RC LWIR FPA HeaterOn (83 K)Nominal
RC SMIR FPA HeaterOffNominal
Scan AssemblyA On; B OffNominal
SDSMA Off; B OffNominal
SRCAA Off; B OffNominal
PS1 Survival HeaterEnabledNominal
PS2 Survival HeaterEnabledNominal
Timing GeneratorA Off; B OnNominal
Flight SoftwareRev BD + 1 set of patches
  • FR Error Counting and Statistics (2 patches)
Nominal
Inhibit Ids SetNoneNominal
TMON 66 (SRCA A)DisabledNominal
TMON 67 (SRCA B)DisabledNominal
TMON 68 (FIFO)EnabledNominal
TMON 69 (EPS Current)DisabledNominal

This Week's Completed MODIS Activities:

Friday, July 13, 2001

2001/194 22:00:00 ATC Set Blackbody temperature to 290K

Saturday, July 14, 2001

2001/195 02:00:00 ATC Set Blackbody temperature to 295K
2001/195 02:00:30 ATC Set Blackbody duty cycle to FULL
2001/195 04:00:00 ATC Set Blackbody temperature to 300K
2001/195 06:00:00 ATC Set Blackbody temperature to 315K
2001/195 09:00:00 ATC Set Blackbody temperature to 270K
2001/195 09:00:30 ATC Set Blackbody duty cycle to THIRD

Sunday, July 15, 2001

2001/196 05:00:00 ATC Set Blackbody temperature to 290K

Monday, July 16, 2001

None

Tuesday, July 17, 2001

None

Wednesday, July 18, 2001

2001/199 21:20:28 ATC OA-16: SD/SDSM Screened
2001/199 22:59:21 ATC OA-15: SD/SDSM Open

Thursday, July 19, 2001

None

Friday, July 20, 2001

None

This Week's Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

During the upcoming week, it is planned to collect an extra 20 minutes of DAY rate data while the spacecraft is over the night side of the Earth. Solar Diffuser calibrations will likely occur on Wednesday, although the precise times have not yet been determined.

Friday, July 20, 2001

None

Saturday, July 21, 2001

None

Sunday, July 22, 2001

None

Monday, July 23, 2001

None

Tuesday, July 24, 2001

None

Wednesday, July 25, 2001

None

Thursday, July 26, 2001

None

Maneuvers:

The next MODIS Lunar Roll Calibration is scheduled for August 9, 2001 ( DOY 221 ) from 05:24:35 to 05:31:05. A second lunar calibration will be performed without a roll maneuver on the same day from 20:23:37 to 20:30:07.

MODIS Anomalies:

Investigation into the PS2 shutdown anomaly is still underway. An anomaly report is expected by the end of this month.

General Instrument Comments:

MODIS is in Science Mode on the A-side with the SVD and NAD open, operating with the Formatter Resolution Flight Software Patches (FRFSP).

MODIS Telemetry Trends:

Trending has resumed with the instrument on the A-side. All appears nominal at this time.

Non-MODIS Significant Events:

None.

Limited Life Item Status:

SRCA 10W Lamp #1: 189.0 of 500 hours
SRCA 10W Lamp #2: 144.7 of 500 hours
SRCA 10W Lamp #3: 153.9 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours

SRCA 1W Lamp #1: 557.9 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours

Solar Diffuser Door: 1651 of 3022 Movements
Nadir Aperture Door: 532 of 1316 Movements
Space View Door: 437 of 1316 Movements