Mission Operations Days: 2001/195 to 2001/201
July 14, 2001 00:00:00 GMT to July 20, 2001 00:00:00 GMT
Terra Spacecraft and MODIS Instrument Status:
Terra (AM-1) is in Normal Ops Mode MODIS is in Science Mode - A Side |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A On (290 K); B Off | Nominal |
Calibration Electronics | A On; B Off | Nominal |
Control Processor | A On; B Off | Nominal |
Nadir Door | Unlatched, Open | Nominal |
Space View Door | Unlatched, Open | Nominal |
Solar Diffuser Door | Unlatched, Closed | Nominal |
FDDI Formatter | A On; B Off | Nominal |
FDDI Port | A On; B Off | Nominal |
FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal |
Format Processor | A On; B Off | Nominal |
Power Supplies | #1 On; #2 Off | Nominal |
PV VIS FPA | A On; B Off | Nominal |
PV NIR FPA | A On; B Off | Nominal |
PV SMIR FPA | A On; B Off | Nominal |
PV LWIR FPA | A On; B Off | Nominal |
PC LWIR FPA | A On; B Off | Nominal |
RC Outgas Heaters | All Off (CS, IS, OS) | Nominal |
RC LWIR FPA Heater | On (83 K) | Nominal |
RC SMIR FPA Heater | Off | Nominal |
Scan Assembly | A On; B Off | Nominal |
SDSM | A Off; B Off | Nominal |
SRCA | A Off; B Off | Nominal |
PS1 Survival Heater | Enabled | Nominal |
PS2 Survival Heater | Enabled | Nominal |
Timing Generator | A Off; B On | Nominal |
Flight Software | Rev BD + 1 set of patches
|
Nominal |
Inhibit Ids Set | None | Nominal |
TMON 66 (SRCA A) | Disabled | Nominal |
TMON 67 (SRCA B) | Disabled | Nominal |
TMON 68 (FIFO) | Enabled | Nominal |
TMON 69 (EPS Current) | Disabled | Nominal |
This Week's Completed MODIS Activities:
Friday, July 13, 2001
2001/194 22:00:00 ATC Set Blackbody temperature to 290K
Saturday, July 14, 2001
2001/195 02:00:00 ATC Set Blackbody temperature to 295K
2001/195 02:00:30 ATC Set Blackbody duty cycle to FULL
2001/195 04:00:00 ATC Set Blackbody temperature to 300K
2001/195 06:00:00 ATC Set Blackbody temperature to 315K
2001/195 09:00:00 ATC Set Blackbody temperature to 270K
2001/195 09:00:30 ATC Set Blackbody duty cycle to THIRD
Sunday, July 15, 2001
2001/196 05:00:00 ATC Set Blackbody temperature to 290K
Monday, July 16, 2001
None
Tuesday, July 17, 2001
None
Wednesday, July 18, 2001
2001/199 21:20:28 ATC OA-16: SD/SDSM Screened
2001/199 22:59:21 ATC OA-15: SD/SDSM Open
Thursday, July 19, 2001
None
Friday, July 20, 2001
None
This Week's Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
During the upcoming week, it is planned to collect an extra 20 minutes of DAY rate data while the spacecraft is over the night side of the Earth. Solar Diffuser calibrations will likely occur on Wednesday, although the precise times have not yet been determined.
Friday, July 20, 2001
None
Saturday, July 21, 2001
None
Sunday, July 22, 2001
None
Monday, July 23, 2001
None
Tuesday, July 24, 2001
None
Wednesday, July 25, 2001
None
Thursday, July 26, 2001
None
Maneuvers:
The next MODIS Lunar Roll Calibration is scheduled for August 9, 2001 ( DOY 221 ) from 05:24:35 to 05:31:05. A second lunar calibration will be performed without a roll maneuver on the same day from 20:23:37 to 20:30:07.
MODIS Anomalies:
Investigation into the PS2 shutdown anomaly is still underway. An anomaly report is expected by the end of this month.
General Instrument Comments:
MODIS is in Science Mode on the A-side with the SVD and NAD open, operating with the Formatter Resolution Flight Software Patches (FRFSP).
MODIS Telemetry Trends:
Trending has resumed with the instrument on the A-side. All appears nominal at this time.
Non-MODIS Significant Events:
None.
Limited Life Item Status:
SRCA 10W Lamp #1: 189.0 of 500 hours
SRCA 10W Lamp #2: 144.7 of 500 hours
SRCA 10W Lamp #3: 153.9 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours
SRCA 1W Lamp #1: 557.9 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours
Solar Diffuser Door: 1651 of 3022 Movements
Nadir Aperture Door: 532 of 1316 Movements
Space View Door: 437 of 1316 Movements