Mission Operations Days: 2003/032 to 2003/038
February 01, 2003 00:00:00 GMT to February 07, 2003 00:00:00 GMT
Terra Spacecraft and MODIS Instrument Status:
AM-1 "Terra" is in Normal Mode PFM MODIS is in A-Side Nominal Science Mode (Cross Strapped with FR B) |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A On (290 K); B Off | Nominal Science Mode |
Calibration Electronics | A On; B Off | Nominal Science Mode |
Control Processor | A On; B Off | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A On; B Off | Nominal Science Mode |
FDDI Port | A On; B Off | Nominal Science Mode |
FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 On, #2 Off | Nominal Science Mode |
PV VIS FPA | A On; B Off | Nominal Science Mode |
PV NIR FPA | A On; B Off | Nominal Science Mode |
PV SMIR FPA | A On; B Off | Nominal Science Mode |
PV LWIR FPA | A On; B Off | Nominal Science Mode |
PC LWIR FPA | A On; B Off | Nominal Science Mode |
RC Outgas Heaters | All Off (CS, IS, OS) | Nominal Science Mode |
RC LWIR FPA Heater | On (83 K) | Nominal Science Mode |
RC SMIR FPA Heater | Off | Nominal Science Mode |
Scan Assembly | A On; B Off | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heater | Enabled | Nominal Science Mode |
PS2 Survival Heater | Enabled | Nominal Science Mode |
Timing Generator | A On; B Off | Nominal Science Mode |
Flight Software | Rev BD + 9 sets of patches
|
Nominal Science Mode |
Inhibit Ids Set | none | Nominal Science Mode |
TMON 66 | Disabled | Nominal Science Mode |
TMON 67 | Disabled | Nominal Science Mode |
TMON 68 | Enabled | Nominal Science Mode |
TMON 69 | Disabled | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, February 1, 2003
(Continuation of Parked SDSM Calibrations)
2003/032 21:00:14-21:00:38 Real-Time MOD_RUN_MACRO(9) CP Macro 9 - Move SDD/SDS to Closed
2003/032 21:03:33-21:05:13 Real-Time MOD_SDSM_OFF('N') Returns SDSM Mirror to Home Position Turns Off the A Side SDSM ('N' = Do not set the SDSM Inhibit ID #53)
2003/032 22:18:37 Real-Time FS1_EXEC_INHIB_ID_SET(33) Sets Inhibit ID 33
2003/032 22:19:02 Real-Time FS1_EXEC_INHIB_ID_SET(53) Sets Inhibit ID 53
2003/032 22:19:26 Real-Time FS1_EXEC_INHIB_ID_SET(58) Sets Inhibit ID 58
Sunday, February 2, 2003
2003/033 02:13:36 Real-Time FS1_EXEC_INHIB_ID_RST(33) Inhibit ID 33 cleared
FS1_EXEC_INHIB_ID_RST(53) Inhibit ID 53 cleared
FS1_EXEC_INHIB_ID_RST(58) Inhibit ID 58 cleared
Monday, February 3, 2003
2003/034 09:00:00 ATC MOD_OA26_BB_270K_A.1 Set blackbody temperature to 270K on the A-side
Tuesday, February 4, 2003
2003/035 03:00:00 ATC MOD_OA26_BB_280K_A.1 Set blackbody temperature to 280K on the A-side
2003/035 07:00:00 ATC MOD_OA26_BB_285K_A.1 Set blackbody temperature to 285K on the A-side
2003/035 10:00:00 ATC MOD_OA26_BB_290K_A.1 Set blackbody temperature to 290K on the A-side
2003/035 14:00:00 ATC MOD_OA26_BB_315K_A.1 Set blackbody temperature to 315K on the A-side
2003/035 14:00:30 ATC MOD_OA26_BB_DCYCLE_FULL.1 Set blackbody heater duty cycle to FULL
2003/035 17:00:00 ATC MOD_OA26_BB_270K_A.1 Set blackbody temperature to 270K on the A-side
2003/035 17:00:30 ATC MOD_OA26_BB_DCYCLE_THIRD.1 Set blackbody heater duty cycle to THIRD
Wednesday, February 5, 2003
2003/036 13:00:00 ATC MOD_OA26_BB_290K_A.1 Set blackbody temperature to 290K on the A-side
Thursday, February 6, 2003
None
Friday, February 7, 2003
None
This Week’s Scheduled MODIS Activities Not Completed:
Saturday, February 1, 2003
(Due to the SFE anomaly)
2003/030 23:34:16-23:47:27 ATC MOD_OA15_SD_OPEN_FIXED_SD_A.1 OA-15: SD/SDSM Open - A Side - SDSM Fixed at SD View
Upcoming MODIS Events:
Wednesday, February 12, 2003
2003/043 21:39:31-21:48:54 ATC MOD_OA16_SD_SCREEN_FXD_SUN_A.1 OA-16: SD/SDSM Screened with SDSM Fixed At Sun View - A Side
2003/043 22:27:38-23:01:11 ATC MOD_OA19_SRCA_FULL_RAD_A.3 OA-19: SRCA Full Radiometric - A Side
2003/043 23:18:23-23:27:46 ATC MOD_OA15_SD_OPEN_FIXED_SD_A.1 OA-15: SD/SDSM Open - A Side - SDSM Fixed at SD View
February calibrations: biweekly SDSM, monthly SRCA Radiometric, and bimonthly PV Ecal.
Maneuvers:
The next MODIS Lunar calibration will be scheduled for February 21, 2003 (2003/052), with data collection from 01:08:08 to 01:14:38 (GMT). The roll angle will be -10.3622 degrees.
The Terra Deep Space Calibration Maneuvers are now being planned for March 26th, 2003 (without the moon in the instruments fields of view) and April 14th, 2003 (with the moon in the spacecraft orbit plane). Details of these maneuvers will be provided closer to the event dates.
MODIS Anomalies:
MODIS data loss (See Non-MODIS Significant Events).
General Instrument Comments:
MODIS is in Science Mode, using all A-side components, but cross-strapped to Formatter B, with the blackbody maintained at 290K.
MODIS Telemetry Trends:
Nominal telemetry tracking is taking place. The intermediate stage radiative cooler temperature that had been increasing has now leveled off. The cooler temperatures and focal plane heater power will continue to be monitored with the expected solar beta angle changes.
Non-MODIS Significant Events:
On Saturday, February 1, 2003 (doy 032), at 01:47:28 GMT, MODIS Science Data stopped being written to the SSR. There was no anomalous telemetry being reported by either MODIS or any of the other Spacecraft Subsystems. All telemetry, save for the non-incrementing SSR buffer, appeared to indicate a healthy Spacecraft. After initial observations, it was noted that no high rate data from ASTER, MISR, or MODIS was being record (hinting at a problem with the SFE or SSR). The cause of the problem was determined to be a locked up SFE-A HPM-2A board on the spacecraft, not MODIS. The SFE-A was power cycled, and all of its components were brought up nominally. Due to this anomaly, there was a MODIS science data loss from 2003/032 01:47:28 to 23:26:43 (21 hours, 39 minutes, 15 seconds). Also due to this anomaly, the final 13 SDSM Screened collections, and the final SDSM Open collection were lost due to the data “black out” period.
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 208.2 of 500 hours
SRCA 10W Lamp #2: 157.1 of 500 hours
SRCA 10W Lamp #3: 166.3 of 500 hours
SRCA 10W Lamp #4: 61.9 of 500 hours
SRCA 1W Lamp #1: 561.2 of 4000 hours
SRCA 1W Lamp #2: 276.5 of 4000 hours
Solar Diffuser Door: 2103 of 3022 Movements
Nadir Aperture Door: 536 of 1316 Movements
Space View Door: 439 of 1316 Movements