Mission Operations Days: 2003/039 to 2003/045
February 08, 2003 00:00:00 GMT to February 14, 2003 00:00:00 GMT
Terra Spacecraft and MODIS Instrument Status:
AM-1 "Terra" is in Normal Mode PFM MODIS is in A-Side Nominal Science Mode (Cross Strapped with FR B) |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A On (290 K); B Off | Nominal Science Mode |
Calibration Electronics | A On; B Off | Nominal Science Mode |
Control Processor | A On; B Off | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A On; B Off | Nominal Science Mode |
FDDI Port | A On; B Off | Nominal Science Mode |
FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 On, #2 Off | Nominal Science Mode |
PV VIS FPA | A On; B Off | Nominal Science Mode |
PV NIR FPA | A On; B Off | Nominal Science Mode |
PV SMIR FPA | A On; B Off | Nominal Science Mode |
PV LWIR FPA | A On; B Off | Nominal Science Mode |
PC LWIR FPA | A On; B Off | Nominal Science Mode |
RC Outgas Heaters | All Off (CS, IS, OS) | Nominal Science Mode |
RC LWIR FPA Heater | On (83 K) | Nominal Science Mode |
RC SMIR FPA Heater | Off | Nominal Science Mode |
Scan Assembly | A On; B Off | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heater | Enabled | Nominal Science Mode |
PS2 Survival Heater | Enabled | Nominal Science Mode |
Timing Generator | A On; B Off | Nominal Science Mode |
Flight Software | Rev BD + 9 sets of patches
|
Nominal Science Mode |
Inhibit Ids Set | none | Nominal Science Mode |
TMON 66 | Disabled | Nominal Science Mode |
TMON 67 | Disabled | Nominal Science Mode |
TMON 68 | Enabled | Nominal Science Mode |
TMON 69 | Disabled | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, February 8, 2003
None
Sunday, February 9, 2003
None
Monday, February 10, 2003
None
Tuesday, February 11, 2003
None
Wednesday, February 12, 2003
2003/043 21:39:31-21:48:54 ATC MOD_OA16_SD_SCREEN_FXD_SUN_A.1 OA-16: SD/SDSM Screened with SDSM Fixed At Sun View - A Side
2003/043 22:27:38-23:01:11 ATC MOD_OA19_SRCA_FULL_RAD_A.3 OA-19: SRCA Full Radiometric - A Side
2003/043 23:18:23-23:27:46 ATC MOD_OA15_SD_OPEN_FIXED_SD_A.1 OA-15: SD/SDSM Open - A Side - SDSM Fixed at SD View
Thursday, February 13, 2003
None
Friday, February 14, 2003
None
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
February calibrations: bimonthly PV Ecal.
Maneuvers:
The next MODIS Lunar calibration will be scheduled for February 21, 2003 (2003/052), with data collection from 01:08:08 to 01:14:38 (GMT). The roll angle will be -10.3622 degrees.
The Terra Deep Space Calibration Maneuvers are now being planned for March 26th, 2003 (without the moon in the instruments fields of view) and April 14th, 2003 (with the moon in the spacecraft orbit plane). Details of these maneuvers will be provided closer to the event dates.
MODIS Anomalies:
MODIS data loss (See Non-MODIS Significant Events).
General Instrument Comments:
MODIS is in Science Mode, using all A-side components, but cross-strapped to Formatter B, with the blackbody maintained at 290K.
MODIS Telemetry Trends:
Nominal telemetry tracking is taking place. The intermediate stage radiative cooler temperature that had been increasing has now leveled off. The cooler temperatures and focal plane heater power will continue to be monitored with the expected solar beta angle changes.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 208.4 of 500 hours
SRCA 10W Lamp #2: 157.2 of 500 hours
SRCA 10W Lamp #3: 166.4 of 500 hours
SRCA 10W Lamp #4: 61.9 of 500 hours
SRCA 1W Lamp #1: 561.2 of 4000 hours
SRCA 1W Lamp #2: 276.5 of 4000 hours
Solar Diffuser Door: 2109 of 3022 Movements
Nadir Aperture Door: 536 of 1316 Movements
Space View Door: 439 of 1316 Movements