Mission Operations Days: 2003/228 to 2003/234
August 16, 2003 00:00:00 GMT to August 22, 2003 00:00:00 GMT
Terra Spacecraft and MODIS Instrument Status:
AM-1 "Terra" is in Normal Mode PFM MODIS is in A-Side Nominal Science Mode (Cross Strapped with FR B) |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A On (290K); B Off | Nominal Science Mode |
Calibration Electronics | A On; B Off | Nominal Science Mode |
Control Processor | A On; B Off | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Screened | Permanent Configuration |
FDDI Formatter | A On; B Off | Nominal Science Mode |
FDDI Port | A On; B Off | Nominal Science Mode |
FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 On, #2 Off | Nominal Science Mode |
PV VIS FPA | A On; B Off | Nominal Science Mode |
PV NIR FPA | A On; B Off | Nominal Science Mode |
PV SMIR FPA | A On; B Off | Nominal Science Mode |
PV LWIR FPA | A On; B Off | Nominal Science Mode |
PC LWIR FPA | A On; B Off | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | On (83K) | Nominal Science Mode |
RC SMIR FPA Heater | Off | Nominal Science Mode |
Scan Assembly | A On; B Off | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heater | Enabled | Nominal Science Mode |
PS2 Survival Heater | Enabled | Nominal Science Mode |
Timing Generator | A On; B Off | Nominal Science Mode |
Flight Software | Rev BD + 11 sets of patches
|
Nominal Science Mode |
Inhibit Ids Set | none | Nominal Science Mode |
TMON 66 | Disabled | Nominal Science Mode |
TMON 67 | Disabled | Nominal Science Mode |
TMON 68 | Enabled | Nominal Science Mode |
TMON 69 | Disabled | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, August 16, 2003
Lunar Calibration Roll Maneuver: -5.145 degrees
2003/228 18:12:35 ATC MOD_SET_FR_RATE TO = DAY
2003/228 18:22:00 Real-Time S/C to Low-Fidelity Pointing
2003/228 19:02:00 ATC MOD_SET_FR_RATE TO = NIGHT
2003/228 19:24:46-19:31:32 MOD_OA08_ROLL_MAN.3
2003/228 19:24:46 ATC MOD_SET_FR_RATE TO = DAY
2003/228 19:24:48 ATC MOD_SET_FR_SCIABNORM TO = ABNORM
2003/228 19:24:50 ATC MOD_SET_FR_PC_DCRCMP TO = OFF
2003/228 19:24:52 ATC MOD_SET_FR_PV_DCRCMP TO = OFF
2003/228 19:24:54 ATC MOD_SET_FR_ENC_DELTA TO = -3072
2003/228 19:31:24 ATC MOD_SET_FR_ENC_DELTA TO = 0
2003/228 19:31:26 ATC MOD_SET_FR_PV_DCRCMP TO = ON
2003/228 19:31:28 ATC MOD_SET_FR_PC_DCRCMP TO = ON
2003/228 19:31:30 ATC MOD_SET_FR_SCIABNORM TO = NORM
2003/228 19:31:32 ATC MOD_SET_FR_RATE TO = NIGHT
2003/228 19:45:00 Real-Time S/C to High-Fidelity Pointing
2003/228 19:51:29 ATC MOD_SET_FR_RATE TO = DAY
(The 06:46 Day Rate data recorded during the maneuver was not balanced out by extra Night Rate over Ground Track Day as per normal operational practice. At no point was the SSR buffer for MODIS in danger of being full.)
Sunday, August 17, 2003
None
Monday, August 18, 2003
None
Tuesday, August 19, 2003
2003/231 20:15:08-20:23:56 ATC MOD_OA16_SDSM_SCRN_NO_DOOR_A.4 OA-16: SD/SDSM Screened - A Side, No Door Movement
Wednesday, August 20, 2003
None
Thursday, August 21, 2003
None
Friday, August 22, 2003
None
This Week's Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
August calibrations will include weekly SDSM, an SRCA Full Radiometric, monthly SRCA 10-Watt Radiometric, bimonthly PV Ecal, and a Lunar Roll Calibration.
Tuesday, August 26, 2003
2003/238 22:01:02-22:09:50 ATC MOD_OA16_SDSM_SCRN_NO_DOOR_A.4 OA16: SD/SDSM screened side A, no door movement.
2003/238 22:40:00-22:40:31 ATC MOD_SRCA_NOMINAL_SETUP.4 Sets up the nominal SRCA lamp configuration for the SRCA activity
2003/238 22:49:51-23:22:54 ATC MOD_OA19_SRCA_FULL_RAD_A.4 OA19: SRCA Full Radiometric Calibration. Data collection from 23:05:45-23:22:53.
Maneuvers:
The next Drag Make-Up (DMU) maneuver is planned for DOY 2003/253 (September 10, 2003). The time of the maneuver is 17:55:00 GMT. The burn duration is scheduled for 30 seconds.
The next Lunar Roll Calibration is planned for DOY 2003/258 (September 15, 2003). Data collect between 13:13:22-13:19:52 GMT. The requested roll angle is -8.9233 degrees.
The next Terra inclination maneuvers are expected in October of 2004.
MODIS Anomalies:
None
General Instrument Comments:
MODIS is in Science Mode, using all A-side components, but cross-strapped to Formatter B, with the blackbody maintained at 290K and the Solar Diffuser Door at the Screened position.
MODIS Telemetry Trends:
Nominal telemetry trending is ongoing.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 216.6 of 500 hours
SRCA 10W Lamp #2: 161.1 of 500 hours
SRCA 10W Lamp #3: 170.3 of 500 hours
SRCA 10W Lamp #4: 62.2 of 500 hours
SRCA 1W Lamp #1: 562.3 of 4000 hours
SRCA 1W Lamp #2: 276.7 of 4000 hours
Solar Diffuser Door: 2146 of 3022 Movements
Nadir Aperture Door: 536 of 1316 Movements
Space View Door: 439 of 1316 Movements