Mission Operations Days: 2005/078 to 2005/084
March 19, 2005 00:00:00 GMT to March 25, 2005 00:00:00 GMT
Terra Spacecraft and MODIS Instrument Status:
AM-1 "Terra" is in Normal Mode PFM MODIS is in A-Side Nominal Science Mode (Cross Strapped with FR B) |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A On (290K); B Off | Nominal Science Mode |
Calibration Electronics | A On; B Off | Nominal Science Mode |
Control Processor | A On; B Off | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Screened | Permanent Configuration |
FDDI Formatter | A On; B Off | Nominal Science Mode |
FDDI Port | A On; B Off | Nominal Science Mode |
FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 On, #2 Off | Nominal Science Mode |
PV VIS FPA | A On; B Off | Nominal Science Mode |
PV NIR FPA | A On; B Off | Nominal Science Mode |
PV SMIR FPA | A On; B Off | Nominal Science Mode |
PV LWIR FPA | A On; B Off | Nominal Science Mode |
PC LWIR FPA | A On; B Off | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | On (83K) | Nominal Science Mode |
RC SMIR FPA Heater | Off | Nominal Science Mode |
Scan Assembly | A On; B Off | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heater | Enabled | Nominal Science Mode |
PS2 Survival Heater | Enabled | Nominal Science Mode |
Timing Generator | A On; B Off | Nominal Science Mode |
Flight Software | Rev BD + 11 sets of patches
|
Nominal Science Mode |
Inhibit Ids Set | none | Nominal Science Mode |
TMON 66 | Disabled | Nominal Science Mode |
TMON 67 | Disabled | Nominal Science Mode |
TMON 68 | Enabled | Nominal Science Mode |
TMON 69 | Disabled | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, March 19, 2005
None
Sunday, March 20, 2005
None
Monday, March 21, 2005
None
Tuesday, March 22, 2005
2005/081 20:36:50-20:45:38 ATC MOD_OA16_SDSM_SCRN_NO_DOOR_A.4 OA-16: SD/SDSM screened side A, no door movement.
2005/081 23:00:00-23:00:31 ATC MOD_SRCA_11_3_8_2_SETUP.1 SRCA setup activity using lamp #4 in lieu of lamp #2
2005/081 23:05:15-23:26:10 ATC MOD_OA20_SRCA_10W_RAD_A_Base.2
OA-20: SRCA 10W Continuous Radiometric - A Side, Using Lamp #1
Data Collect from 23:21:09-23:26:10
Wednesday, March 23, 2005
None
Thursday, March 24, 2005
None
Friday, March 25, 2005
None
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for April will include biweekly SDSM, monthly SRCA Full and 10W Radiometric, bimonthly PV Ecal, and quarterly SRCA Full Spectral and Black Body.
Maneuvers:
There will be no March 2005 Lunar calibration.
MODIS Anomalies:
None
General Instrument Comments:
MODIS is in Science Mode, using all A-side components, but cross-strapped to Formatter B, with the blackbody maintained at 290K and the Solar Diffuser Door at the Screened position.
MODIS Telemetry Trends:
Nominal telemetry trending is ongoing.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 242.2 of 500 hours
SRCA 10W Lamp #2: 173.3 of 500 hours
SRCA 10W Lamp #3: 184.9 of 500 hours
SRCA 10W Lamp #4: 73.2 of 500 hours
SRCA 1W Lamp #1: 567.9 of 4000 hours
SRCA 1W Lamp #2: 278.7 of 4000 hours
Solar Diffuser Door: 2146 of 3022 Movements
Nadir Aperture Door: 538 of 1316 Movements
Space View Door: 441 of 1316 Movements