Mission Operations Days: 2005/085 to 2005/091
March 26, 2005 00:00:00 GMT to April 01, 2005 00:00:00 GMT
Terra Spacecraft and MODIS Instrument Status:
AM-1 "Terra" is in Normal Mode PFM MODIS is in A-Side Nominal Science Mode (Cross Strapped with FR B) |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A On (290K); B Off | Nominal Science Mode |
Calibration Electronics | A On; B Off | Nominal Science Mode |
Control Processor | A On; B Off | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Screened | Permanent Configuration |
FDDI Formatter | A On; B Off | Nominal Science Mode |
FDDI Port | A On; B Off | Nominal Science Mode |
FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 On, #2 Off | Nominal Science Mode |
PV VIS FPA | A On; B Off | Nominal Science Mode |
PV NIR FPA | A On; B Off | Nominal Science Mode |
PV SMIR FPA | A On; B Off | Nominal Science Mode |
PV LWIR FPA | A On; B Off | Nominal Science Mode |
PC LWIR FPA | A On; B Off | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | On (83K) | Nominal Science Mode |
RC SMIR FPA Heater | Off | Nominal Science Mode |
Scan Assembly | A On; B Off | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heater | Enabled | Nominal Science Mode |
PS2 Survival Heater | Enabled | Nominal Science Mode |
Timing Generator | A On; B Off | Nominal Science Mode |
Flight Software | Rev BD + 11 sets of patches
|
Nominal Science Mode |
Inhibit Ids Set | none | Nominal Science Mode |
TMON 66 | Disabled | Nominal Science Mode |
TMON 67 | Disabled | Nominal Science Mode |
TMON 68 | Enabled | Nominal Science Mode |
TMON 69 | Disabled | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, March 26, 2005
None
Sunday, March 27, 2005
None
Monday, March 28, 2005
None
Tuesday, March 29, 2005
None
Wednesday, March 30, 2005
None
Thursday, March 31, 2005
None
Friday, April 1, 2005
None
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for April will include biweekly SDSM, monthly SRCA Full and 10W Radiometric, bimonthly PV Ecal, and quarterly SRCA Full Spectral and Black Body.
Tuesday, April 5, 2005
2005/095 20:47:47-20:56:35 ATC MOD_OA16_SDSM_SCRN_NO_DOOR_A.4 OA-16: SD/SDSM screened side A, no door movement.
2005/095 23:10:00-23:10:31 ATC MOD_SRCA_11_3_8_2_SETUP.1 SRCA setup activity using lamp #4 in lieu of lamp #2
2005/095 23:16:04-23:51:14 ATC MOD_OA19_SRCA_FULL_RAD_A.6 OA-19: SRCA Full Radiometric Calibration.
Data collection from 23:31:58-23:50:15
Wednesday, April 6, 2005
2005/096 03:31:07-03:33:38 ATC MOD_OA27_PV_ECAL.3 OA-27: Photovoltaic bands electronics calibration
Maneuvers:
There will be no April 2005 Lunar calibration.
MODIS Anomalies:
None
General Instrument Comments:
MODIS is in Science Mode, using all A-side components, but cross-strapped to Formatter B, with the blackbody maintained at 290K and the Solar Diffuser Door at the Screened position.
MODIS Telemetry Trends:
Nominal telemetry trending is ongoing.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 242.2 of 500 hours
SRCA 10W Lamp #2: 173.3 of 500 hours
SRCA 10W Lamp #3: 184.9 of 500 hours
SRCA 10W Lamp #4: 73.2 of 500 hours
SRCA 1W Lamp #1: 567.9 of 4000 hours
SRCA 1W Lamp #2: 278.7 of 4000 hours
Solar Diffuser Door: 2146 of 3022 Movements
Nadir Aperture Door: 538 of 1316 Movements
Space View Door: 441 of 1316 Movements