MODIS IOT Terra Weekly Report
Mission Operations Days: 2013/257 through 2013/263
September 14, 2013 00:00:00 GMT to September 20, 2013 00:00:00 GMT
Terra Spacecraft and MODIS Instrument Status:
AM-1 "Terra" is in Normal Mode PFM MODIS is in A-Side Nominal Science Mode (Cross Strapped with FR B) |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A On (290K); B Off | Nominal Science Mode |
Calibration Electronics | A On; B Off | Nominal Science Mode |
Control Processor | A On; B Off | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Screened | Permanent Configuration |
FDDI Formatter | A On; B Off | Nominal Science Mode |
FDDI Port | A On; B Off | Nominal Science Mode |
FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 On, #2 Off | Nominal Science Mode |
PV VIS FPA | A On; B Off | Nominal Science Mode |
PV NIR FPA | A On; B Off | Nominal Science Mode |
PV SMIR FPA | A On; B Off | Nominal Science Mode |
PV LWIR FPA | A On; B Off | Nominal Science Mode |
PC LWIR FPA | A On; B Off | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | On (83K) | Nominal Science Mode |
RC SMIR FPA Heater | Off | Nominal Science Mode |
Scan Assembly | A On; B Off | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heater | Enabled | Nominal Science Mode |
PS2 Survival Heater | Enabled | Nominal Science Mode |
Timing Generator | A On; B Off | Nominal Science Mode |
Flight Software | Rev BD + 11 sets of patches
|
Nominal Science Mode |
Inhibit Ids Set | none | Nominal Science Mode |
TMON 66 | Disabled | Nominal Science Mode |
TMON 67 | Disabled | Nominal Science Mode |
TMON 68 | Enabled | Nominal Science Mode |
TMON 69 | Disabled | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, September 14, 2013
None
Sunday, September 15, 2013
None
Monday, September 16, 2013
None
Tuesday, September 17, 2013
None
Wednesday, September 18, 2013
None
Thursday, September 19, 2013
None
Friday, September 20, 2013
None
This Week’s Scheduled MODIS Activities Not Completed:
None.
This Month’s Upcoming MODIS Events:
Remaining September activities include a Lunar Roll (267).
Monday, September 23, 2013
2013/266 23:43:28 ATC MOD_OA04_FR_NIGHT_RATE.1 (1:53 early)
Tuesday, September 24, 2013
Lunar Roll Maneuver (-8.9613 degrees)
2013/267 00:17:57-00:21:43 ATC MOD_OA08_ROLL_MAN.3
2013/267 00:36:31 ATC MOD_OA03_FR_DAY_RATE.2 (1:53 late)
Maneuvers:
None
MODIS Anomalies:
None
General Instrument Comments:
MODIS is in Science Mode, using all A-side components, but cross-strapped to Formatter B, with the blackbody maintained at 290K and the Solar Diffuser Door at the Screened position.
MODIS Telemetry Trends:
Nominal telemetry trending is ongoing.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.
Limited Life Item Status:
SRCA 10W Lamp #1: 317.0 of 500 hours
SRCA 10W Lamp #2: 172.1 of 500 hours
SRCA 10W Lamp #3: 190.3 of 500 hours
SRCA 10W Lamp #4: 108.8 of 500 hours
SRCA 1W Lamp #1: 587.6 of 4000 hours
SRCA 1W Lamp #2: 282.0 of 4000 hours
Solar Diffuser Door: 2146 of 3022 Movements
Nadir Aperture Door: 540 of 1316 Movements
Space View Door: 443 of 1316 Movements