Mission Operations Days: 2002/264 to 2002/270
September 21, 2002 00:00:00 GMT to September 27, 2002 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ | Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, September 21, 2002
None
Sunday, September 22, 2002
None
Monday, September 23, 2002
2002/266 12:42:11-12:56:09 MCL MOD_OA16_SDSM_SCREEN.2 OA16: SD/SDSM Screened - B-Side
2002/266 13:33:54-13:34:10 MCL MOD_SRCA_SETUP.2 SRCA Setup - B Side
2002/266 13:34:24-14:08:37 MCL MOD_OA19_SRCA_FULL_RAD.1 OA19: SRCA Full Radiometric
2002/266 14:21:04-14:35:02 MCL MOD_OA15_SDSM_OPEN.1 OA15: SD/SDSM Open - B-Side
Tuesday, September 24, 2002
2002/267 12:38:13-12:38:29 MCL MOD_SRCA_SETUP.2 SRCA Setup - B-Side
2002/267 12:38:43-13:36:13 MCL MOD_OA23_SRCA_FULL_SPAT.1 OA23: SRCA Full Spatial
2002/267 21:20-21:39 Real-Time Loaded MODIS Contingency SCSes: FSW_ISC_LOAD_SCS(181,'PM1_SCS_ISC_181_MOD_NAD_TO_CLOSED_V1',1,'Y') FSW_ISC_LOAD_SCS(182,'PM1_SCS_ISC_182_MOD_SVD_TO_CLOSED_V1',1,'Y')
These two MODIS SCSes are to be used in future maneuvers as contingency products (they were specifically designed for concerns raised for the postponed "practice" Inclination Adjust Maneuver). ISC SCS ID's 181 and 182 previously contained the MODIS Yaw Maneuver SCSes, which are not (planned) to be used again at any future date. These SCSes overwrote the old SCSes.
Wednesday, September 25, 2002
None
Thursday, September 26, 2002
None
Friday, September 27, 2002
None
This Week's Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Monday, September 30, 2002
2002/273 11:08:53-11:22:49 MCL MOD_OA16_SDSM_SCREEN.2 OA16: SD/SDSM Screened - B-Side
2002/273 12:47:46-13:01:44 MCL MOD_OA15_SDSM_OPEN.1 OA15: SD/SDSM Open - B-Side
Maneuvers:
The next MODIS lunar calibration maneuver is planned for October 16, 2002 (2002/289). Data collection will be from 14:23:28 to 14:29:58 GMT and the roll angle will be -20.0509 degrees.
The Deep Space Calibration pitch maneuver(s) have been indefinitely suspended pending mission review.
MODIS Anomalies:
The MODIS commanding anomaly is still being investigated. The fault management Stored Command Sequence (SCS) changes to disable the spacecraft "I am OK" (IMOK) signal to MODIS were delivered to the Aqua FOT for testing on Monday, September 16, 2002. They were later loaded to the spacecraft on Friday, September 20, 2002. The memory patch to switch the MODIS ground-command timing slots with the MODIS stored-command timing slots have been delivered to the FOT. Testing and load approval meetings for this patch will occur the week of September 30, 2002.
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 206.9 of 500 hours
SRCA 10W Lamp #2: 179.9 of 500 hours
SRCA 10W Lamp #3: 182.7 of 500 hours
SRCA 10W Lamp #4: 57.7 of 500 hours
SRCA 1W Lamp #1: 500.7 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours
Solar Diffuser Door: 1822 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements