pm1weekly_2002-334_2002-340

Mission Operations Days: 2002/334 to 2002/340
November 30, 2002 00:00:00 GMT to December 06, 2002 00:00:00 GMT


Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Science Mode
Component State(s) Comment
Blackbody A Off; B On Science Mode
Calibration Electronics A Off; B On Science Mode
Control Processor A Off; B On Science Mode
Nadir Door Unlatched, Open Science Mode
Space View Door Unlatched, Open Science Mode
Solar Diffuser Door Unlatched, Closed Science Mode
FDDI Formatter A Off; B On Science Mode
FDDI Port A Off; B On Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Science Mode
Format Processor A Off; B On Science Mode
Power Supplies #1 Off, #2 On Science Mode
PV VIS FPA A Off; B On Science Mode
PV NIR FPA A Off; B On Science Mode
PV SMIR FPA A Off; B On Science Mode
PV LWIR FPA A Off; B On Science Mode
PC LWIR FPA A Off; B On Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Science Mode
RC LWIR FPA Heater Off Science Mode
RC SMIR FPA Heater On Science Mode
Scan Assembly A Off; B On Science Mode
SDSM Off Science Mode
SRCA Off Science Mode
PS1 Survival Heaters Enabled Science Mode
PS2 Survival Heaters Enabled Science Mode
Timing Generator A Off; B On Science Mode
Flight Software Rev BJ Science Mode
Inhibit Ids Set None Science Mode

This Week’s Completed MODIS Activities:

Saturday, November 30, 2002

None

Sunday, December 1, 2002

None

Monday, December 2, 2002

None

Tuesday, December 3, 2002

None

Wednesday, December 4, 2002

2002/338 15:03:13 – 15:17:11 MCL MOD_OA16_SDSM_SCREEN.2 OA16: SDSM Calibration with SD Screened - B Side
2002/338 16:42:05 – 16:56:03 MCL MOD_OA15_SDSM_OPEN.1 OA15: SDSM Calibration with SD Open - B Side

Thursday, December 5, 2002:

None

Friday, December 6, 2002

None

This Week’s Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Monday, December 9, 2002

2002/343 15:21:26 – 15:35:24 MCL MOD_OA16_SDSM_SCREEN.2 OA16: SDSM Calibration with SD Screened - B Side
2002/343 17:00:19 – 17:14:17 MCL MOD_OA15_SDSM_OPEN.1 OA15: SDSM Calibration with SD Open - B Side

December calibrations include weekly SD/SDSM events, an SRCA Full Radiometric, and a PV Electronics Calibration.

SRCA activities are being developed to measure detector crosstalk and will be performed in the near future.

Maneuvers:

The next Aqua MODIS Lunar Calibration via roll maneuver will be on December 14th, 2002 (2002/348). The roll angle will be -1.4207 degrees and the data collection period will be from 22:04:40 to 22:11:10 GMT.

The Deep Space Calibration pitch maneuver(s) have been indefinitely suspended pending mission review.

The next Aqua drag make-up maneuver is planned for Thursday, December 12th, 2002 (2002/346) at approximately 15:40 GMT.

MODIS Anomalies:

On November 7, 2002 (DOY 2002/311), a final patch to the BST was outlined. The two MODIS command slots in the BST that are currently switched will be returned to their original locations. At the same time, the command slots will be given a one sub-minor cycle delay. This will result in the command slots having the desired delay period between themselves, and the bus signals that are believed to have caused the occasional problems with MODIS receiving commands.

A software patch review meeting was held on Friday, December 6th to discuss the testing of the next BST patch. The Aqua FOT and the MODIS IOT will be testing the patch during the week of December 9th.

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally. A slight increase in the radiative cooler intermediate stage temperature has been observed along with a decrease in the focal plane heater power usage. These telemetry points will be closely monitored for additional changes over the next several weeks.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/links/links.htm

Limited Life Item Status:

SRCA 10W Lamp #1: 209.9 of 500 hours
SRCA 10W Lamp #2: 181.7 of 500 hours
SRCA 10W Lamp #3: 184.5 of 500 hours
SRCA 10W Lamp #4: 57.7 of 500 hours

SRCA 1W Lamp #1: 501.0 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours

Solar Diffuser Door: 1882 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements