Mission Operations Days: 2002/355 to 2002/361
December 21, 2002 00:00:00 GMT to December 27, 2002 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On | Science Mode |
Calibration Electronics | A Off; B On | Science Mode |
Control Processor | A Off; B On | Science Mode |
Nadir Door | Unlatched, Open | Science Mode |
Space View Door | Unlatched, Open | Science Mode |
Solar Diffuser Door | Unlatched, Closed | Science Mode |
FDDI Formatter | A Off; B On | Science Mode |
FDDI Port | A Off; B On | Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Science Mode |
Format Processor | A Off; B On | Science Mode |
Power Supplies | #1 Off, #2 On | Science Mode |
PV VIS FPA | A Off; B On | Science Mode |
PV NIR FPA | A Off; B On | Science Mode |
PV SMIR FPA | A Off; B On | Science Mode |
PV LWIR FPA | A Off; B On | Science Mode |
PC LWIR FPA | A Off; B On | Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Science Mode |
RC LWIR FPA Heater | Off | Science Mode |
RC SMIR FPA Heater | On | Science Mode |
Scan Assembly | A Off; B On | Science Mode |
SDSM | Off | Science Mode |
SRCA | Off | Science Mode |
PS1 Survival Heaters | Enabled | Science Mode |
PS2 Survival Heaters | Enabled | Science Mode |
Timing Generator | A Off; B On | Science Mode |
Flight Software | Rev BJ | Science Mode |
Inhibit Ids Set | None | Science Mode |
This Week’s Completed MODIS Activities:
Saturday, December 21, 2002
None
Sunday, December 22, 2002
None
Monday, December 23, 2002
2002/357 15:33:39-15:47:37 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B Side
2002/357 16:25:21-16:25:37 MCL MOD_SRCA_SETUP.2 SRCA Setup Activity
2002/357 16:25:51-17:00:04 MCL MOD_OA19_SRCA_FULL_RAD.1 OA-19: SRCA Full Radiometric - B Side
2002/357 17:12:32-17:26:30 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Opened - B Side
2002/357 18:17:29-18:20:00 MCL MOD_OA27_PV_ECAL.1 OA-27: PV ECAL
Tuesday, December 24, 2002
None
Wednesday, December 25, 2002
None
Thursday, December 26, 2002
None
Friday, December 27, 2002
None
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
SRCA activities are being developed to measure detector cross talk and will be performed in the near future.
Maneuvers:
The next Aqua MODIS Lunar Calibration via roll maneuver will be on January 13th, 2002 (2003/013). The roll
angle will be -5.3215 degrees and the data collection period will be from 18:45:25 to 18:51:55 GMT.
The Deep Space Calibration pitch maneuver(s) have been indefinitely suspended pending mission review.
MODIS Anomalies:
On November 7, 2002 (DOY 2002/311), a final patch to the BST was outlined. The two MODIS command slots
in the BST that are currently switched will be returned to their original locations. At the same time, the
command slots will be given a one sub-minor cycle delay. This will result in the command slots having the
desired delay period between themselves, and the bus signals that are believed to have caused the occasional
problems with MODIS receiving commands.
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally. A slight increase in the radiative cooler
intermediate stage temperature has been observed along with a decrease in the focal plane heater power usage.
These telemetry points will be closely monitored for additional changes over the next several weeks.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following
URL. Note that a password is now required to access the EOS mission links webpages. There are directions at
the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 210.1 of 500 hours
SRCA 10W Lamp #2: 181.8 of 500 hours
SRCA 10W Lamp #3: 184.6 of 500 hours
SRCA 10W Lamp #4: 57.7 of 500 hours
SRCA 1W Lamp #1: 501.1 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours
Solar Diffuser Door: 1900 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements