Mission Operations Days: 2003/004 to 2003/010
January 04, 2003 00:00:00 GMT to January 10, 2003 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ | Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, January 4, 2003
None
Sunday, January 5, 2003
None
Monday, January 6, 2003
2003/006 14:10:58 - 14:24:56 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B Side
2003/006 15:49:51 - 16:03:49 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Opened - B Side
Tuesday, January 7, 2003
None
Wednesday, January 8, 2003
None
Thursday, January 9, 2003
None
Friday, January 10, 2003
None
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Monday, January 13, 2003
2003/013 12:34:53 - 12:48:51 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B Side
2003/013 14:13:46 - 14:27:44 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Opened - B Side
Lunar Roll Maneuver (-5.3215 degree roll)
2003/013 17:42:06 MCL MOD_OA03_FR_DAY_RATE.1 Formatter Day rate transition at normal time in lieu of SCS #56
2003/013 18:28:11 MCL MOD_OA03_FR_NIGHT_RATE.2 Formatter Night rate transition 03:23 early to compensate for extra day rate during roll maneuver
2003/013 18:45:17 - 18:52:03 MCL MOD_OA08_ROLL_MAN.1 Lunar calibration during spacecraft roll maneuver
2003/013 19:24:23 MCL MOD_OA03_FR_DAY_RATE.1 Formatter Day rate transition 03:23 late to compensate for extra day rate during roll maneuver
2003/013 20:10:28 MCL MOD_OA03_FR_NIGHT_RATE.2 Formatter Night rate transition at normal time in lieu of SCS #56
Quarterly SRCA spectral and black body, bi-monthly SRCA spatial, monthly SRCA radiometric, and bi-weekly SDSM calibrations will be scheduled in January..
SRCA activities are being developed to measure detector cross talk and will be performed in the near future.
A flight software patch is planned to the Control Processor CP07 mode transition table to not turn off the instrument formatter when MODIS transitions to Safe Mode. This patch is expected to be loaded by the end of January.
Maneuvers:
The next Aqua MODIS Lunar Calibration via roll maneuver will be on January 13th, 2003 (2003/013). The roll angle will be -5.3215 degrees and the data collection period will be from 18:45:25 to 18:51:55 GMT.
The Deep Space Calibration pitch maneuver(s) have been indefinitely suspended pending mission review.
MODIS Anomalies:
On November 7, 2002 (DOY 2002/311), a final patch to the BST was outlined. The two MODIS command slots in the BST that are currently switched will be returned to their original locations. At the same time, the command slots will be given a one sub-minor cycle delay. This will result in the command slots having the desired delay period between themselves, and the bus signals that are believed to have caused the occasional problems with MODIS receiving commands. This patch is still under development.
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally. A slight increase in the radiative cooler intermediate stage temperature has been observed along with a decrease in the focal plane heater power usage. The radiative cooler temperatures has not leveled off as dramatically for the FM1 MODIS as they did for the PFM MODIS, but the intermediate stage temperature has only risen about 1 degree Celsius and the focal plane heater still has approximately 40mW of power margin remaining. These telemetry points will continued to be closely monitored.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 210.1 of 500 hours
SRCA 10W Lamp #2: 181.8 of 500 hours
SRCA 10W Lamp #3: 184.6 of 500 hours
SRCA 10W Lamp #4: 57.7 of 500 hours
SRCA 1W Lamp #1: 501.1 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours
Solar Diffuser Door: 1912 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements