Mission Operations Days: 2003/032 to 2003/038
February 01, 2003 00:00:00 GMT to February 07, 2003 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ | Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, February 1, 2003
2003/032 20:44:46-20:45:02 MCL MOD_SRCA_SETUP.2 SRCA B Side Configuration
2003/032 20:45:16-22:44:40 MCL MOD_OA21_SRCA_1W_RAD.2 OA-21: SRCA 1W Radiometric (Continuous) Begins 5 minutes prior to S/C Night, Orbit 3985 Ends 15 minutes after S/C Night, Orbit 3986 * activity was built to include SRCA Off SCS
Sunday, February 2, 2003
None
Monday, February 3, 2003
2003/034 01:00:00 MCL MOD_BB_TEMP_SET_270K_B.1 BB Temp Set to 270K for CP B Coefficients
2003/034 19:00:00 MCL MOD_BB_TEMP_SET_280K_B.1 BB Temp Set to 280K for CP B Coefficients
2003/034 19:30:16-19:44:14 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B Side
2003/034 21:09:10-21:23:08 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Opened - B Side
2003/034 23:00:00 MCL MOD_BB_TEMP_SET_285K_B.1 BB Temp Set to 285K for CP B Coefficients
Tuesday, February 4, 2003
2003/035 02:00:00 MCL MOD_BB_TEMP_SET_290K_B.1 BB Temp Set to 290K for CP B Coefficients
2003/035 06:00:00 MCL MOD_BB_TEMP_SET_295K_B.1 BB Temp Set to 295K for CP B Coefficients
2003/035 06:00:30 MCL MOD_BB_DCYCLE_FULL.1 BB Duty Cycle set to FULL
2003/035 10:00:00 MCL MOD_BB_TEMP_SET_315K_B.1 BB Temp Set to 315K for CP B Coefficients
2003/035 13:00:00 MCL MOD_BB_TEMP_SET_270K_B.1 BB Temp Set to 270K for CP B Coefficients
2003/035 13:00:30 MCL MOD_BB_DCYCLE_THIRD.1 BB Duty Cycle set to THIRD
Wednesday, February 5, 2003
2003/036 09:00:00 MCL MOD_BB_TEMP_SET_285K_B.1 BB Temp Set to 285K for CP B Coefficients
Thursday, February 6, 2003
None
Friday, February 7, 2003
None
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Monday, February 10, 2003
2003/41 21:19:58 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B Side
2003/41 22:58:51 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Opened - B Side
Wednesday, February 12, 2003
Lunar Roll Maneuver (-11.6949 degree roll)
2003/043 13:00:08 - 13:46:12 MOD_OA03_FR_DAY_RATE.1
2003/043 13:46:12 - 13:58:34 MOD_OA03_FR_NIGHT_RATE.2
Formatter Night rate transition 03:23 early to compensate for extra day rate during roll maneuver
2003/043 13:58:34 - 14:05:20 MOD_OA08_ROLL_MAN.1
Lunar calibration during spacecraft roll maneuver
2003/043 14:05:20 - 14:42:24 MOD_OA03_FR_NIGHT_RATE.2
2003/043 14:42:24 - 15:28:28 MOD_OA03_FR_DAY_RATE.1
Formatter Day rate transition 03:23 later to compensate for extra day rate during roll maneuver
February calibrations: biweekly SDSM, monthly SRCA Radiometric, and bimonthly PV Ecal.
A flight software patch is planned to the Control Processor CP07 mode transition table to not turn off the instrument formatter when MODIS transitions to Safe Mode.
Maneuvers:
The next Aqua MODIS Lunar Calibration via roll maneuver will be on February 12th, 2003 (2003/043). The roll angle will be -11.6949 degrees and the data collection period will be from 13:58:42 to 14:05:12 GMT.
The Deep Space Calibration pitch maneuver(s) have been indefinitely suspended pending mission review.
MODIS Anomalies:
Work is still underway to fix the current BST patch as well as modify the final BST patch that was nearing final review approval. This fix will solve the problem of MODIS Ground Command transactions being disabled by MODIS Stored Commands.
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally. A slight increase in the radiative cooler intermediate stage temperature has been observed along with a decrease in the focal plane heater power usage. The radiative cooler temperatures has not leveled off as dramatically for the FM1 MODIS as they did for the PFM MODIS, but the intermediate stage temperature has only risen about 1 degree Celsius and the focal plane heater still has approximately 40mW of power margin remaining. These telemetry points will continue to be closely monitored.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 214.7 of 500 hours
SRCA 10W Lamp #2: 183.5 of 500 hours
SRCA 10W Lamp #3: 186.3 of 500 hours
SRCA 10W Lamp #4: 57.7 of 500 hours
SRCA 1W Lamp #1: 503.1 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours
Solar Diffuser Door: 1936 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements