Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week’s Completed MODIS Activities:

Saturday, February 22, 2003

None

Sunday, February 23, 2003

None

Monday, February 24, 2003

2003/055 14:54:23 - 15:08:21 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B Side
2003/055 16:33:16 - 16:47:14 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Opened - B Side
2003/055 18:21:30 - 18:24:01 MCL MOD_OA27_PV_ECAL.1 OA-27: Photo-voltaic band electronics calibration

Tuesday, February 25, 2003

None

Wednesday, February 26, 2003

None

Thursday, February 27, 2003

None

Friday, February 28, 2003

None

This Week’s Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Monday, March 3, 2003

2003/062 16:40:07 - 16:54:05 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B Side
2003/062 18:19:01 - 18:32:59 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Opened - B Side

March calibrations for the FM1 MODIS instrument include an SRCA full radiometric, an SRCA full spatial, and weekly SD calibrations.

A flight software patch is planned to the Control Processor CP07 mode transition table to not turn off the instrument formatter when MODIS transitions to Safe Mode. However, this patch is still postponed until the Aqua BST patch has been implemented.

Maneuvers:

The next FM1 MODIS lunar calibration via spacecraft roll maneuver is March 14th, 2003 (2003/073) with data collection from 07:37:46 to 07:44:16 GMT and a roll angle of -13.7657 degrees.

The Deep Space Calibration pitch maneuver(s) are still postponed pending the results of the Terra Deep Space Calibration maneuvers currently planned for March 26th and April 14th, 2003.

MODIS Anomalies:

Work is still underway to fix the current BST patch as well as modify the final BST patch that was nearing final review approval. This fix will solve the problem of MODIS Ground Command transactions being disabled by MODIS Stored Commands.

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally. The radiative cooler temperatures have leveled off with approximately 37mW of margin left with the SMIR focal plane heater These telemetry points will continue to be closely monitored.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/links/links.htm

Limited Life Item Status:

SRCA 10W Lamp #1: 214.8 of 500 hours
SRCA 10W Lamp #2: 183.6 of 500 hours
SRCA 10W Lamp #3: 186.4 of 500 hours
SRCA 10W Lamp #4: 57.7 of 500 hours

SRCA 1W Lamp #1: 503.2 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours

Solar Diffuser Door: 1954 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements