Mission Operations Days: 2003/088 to 2003/094
March 29, 2003 00:00:00 GMT to April 04, 2003 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ | Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, March 29, 2003
None
Sunday, March 30, 2003
None
Monday, March 31, 2003
2003/090 10:32:11 - 10:36:09 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screen - B Side
2003/090 12:11:05 - 12:25:03 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B Side
Tuesday, April 1, 2003
None
Wednesday, April 2, 2003
None
Thursday, April 3, 2003
None
Friday, April 4, 2003
None
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Monday, April 7, 2003
2003/097 13:57:03 - 14:11:01 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screen - B Side
2003/097 15:35:57 - 15:49:55 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B Side
Saturday, April 12, 2003
Lunar Roll Maneuver (-10.4528 degree roll)
2003/102 19:23:25 MCL MOD_OA03_FR_DAY_RATE.1 Formatter to Day Rate (normal terminator crossing time)
2003/102 20:09:37 MCL MOD_OA03_FR_NIGHT_RATE.2 Formatter to Night Rate (03:23 early)
2003/102 20:23:10 - 20:29:56 MCL MOD_OA08_ROLL_MAN.1 OA08: Lunar calibration during spacecraft roll maneuver
2003/102 21:05:41 MCL MOD_OA03_FR_DAY_RATE.1 Formatter to Day Rate (03:23 late)
2003/102 21:51:53 MCL MOD_OA03_FR_NIGHT_RATE.2 Formatter to Night Rate (normal terminator crossing time)
April calibrations for the FM1 MODIS instrument include an SRCA full radiometric, an SRCA spectral, a PV Ecal, a Lunar Calibration Roll, and weekly SD calibrations.
Maneuvers:
The next FM1 MODIS Lunar Calibration via Spacecraft Roll Maneuver is April 12, 2003 (DOY 2003/102) with data collection from 20:23:18 to 20:29:58 GMT and a roll angle of -10.4528 degrees.
The Deep Space Calibration pitch maneuver(s) are still postponed pending the results of the Terra Deep Space Calibration maneuvers currently planned for March 26 and April 14, 2003.
MODIS Anomalies:
Recent SRCA calibrations have shown that SRCA lamp #2 is not producing the same output characteristics as the other SRCA 10 Watt lamps. Upcoming SRCA Full Radiometric and Full Spatial calibrations will use the backup lamp (#4) in lieu of lamp #2. After the data are analyzed, a decision will be made regarding which 10W lamps to use for the nominal schedule of SRCA calibrations.
Work is still underway to fix the current BST patch as well as modify the final BST patch that was nearing final review approval. This fix will solve the problem of MODIS Ground Command transactions being disabled by MODIS Stored Commands. A test review for the second BST patch has been scheduled for Wednesday, April 9th, 2003.
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally and the radiative cooler temperatures have stabilized.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 215.6 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 187.1 of 500 hours
SRCA 10W Lamp #4: 58.4 of 500 hours
SRCA 1W Lamp #1: 503.2 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours
Solar Diffuser Door: 1984 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements