pm1weekly_2003-095_2003-101

Mission Operations Days: 2003/095 to 2003/101
April 05, 2003 00:00:00 GMT to April 11, 2003 00:00:00 GMT


Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week’s Completed MODIS Activities:

Saturday, April 5, 2003

None

Sunday, April 6, 2003

None

Monday, April 7, 2003

2003/097 13:57:03 - 14:11:01 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screen - B Side
2003/097 15:35:57 - 15:49:55 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B Side

Tuesday, April 8, 2003

None

Wednesday, April 9, 2003

None

Thursday, April 10, 2003

None

Friday, April 11, 2003

None

This Week’s Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Saturday, April 12, 2003

Lunar Roll Maneuver (-10.4528 degree roll)
2003/102 19:23:25 MCL MOD_OA03_FR_DAY_RATE.1 Formatter to Day Rate (normal terminator crossing time)
2003/102 20:09:37 MCL MOD_OA03_FR_NIGHT_RATE.2 Formatter to Night Rate (03:23 early)
2003/102 20:23:10 - 20:29:56 MCL MOD_OA08_ROLL_MAN.1 OA08: Lunar calibration during spacecraft roll maneuver
2003/102 21:05:41 MCL MOD_OA03_FR_DAY_RATE.1 Formatter to Day Rate (03:23 late)
2003/102 21:51:53 MCL MOD_OA03_FR_NIGHT_RATE.2 Formatter to Night Rate (normal terminator crossing time)

Monday, April 14, 2003

2003/104 12:25:06 - 12:39:04 MCL MOD_OA16_SDSM_SCREEN.2 OA16: SD Calibration with SD door screened
2003/104 13:15:00 - 13:15:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/104 13:18:03 - 13:52:16 MCL MOD_OA19_SRCA_FULL_RAD.1 OA19: SRCA Full Radiometric calibration
2003/104 14:03:59 - 14:17:57 MCL MOD_OA15_SDSM_OPEN.1 OA15: SD Calibration with SD door opened
2003/104 21:30:00 - 21:30:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/104 21:31:30 - 21:28:27 MCL MOD_OA23_SRCA_FULL_SPAT.1 OA23: SRCA Full Spatial calibration

Tuesday, April 15, 2003

The Aqua patch to the Bus Scheduler Task will be loaded to the spacecraft. This will correct the MODIS dropped / delayed command anomaly. If this patch is successful, the Aqua MODIS SRCA crosstalk calibration will be rescheduled and a patch to the MODIS control processor mode transition table will be performed in the near future.

April calibrations for the FM1 MODIS instrument include an SRCA full radiometric, an SRCA spectral, a PV Ecal, a Lunar Calibration Roll, and weekly SD calibrations.

Maneuvers:

The next FM1 MODIS Lunar Calibration via Spacecraft Roll Maneuver is April 12, 2003 (DOY 2003/102) with data collection from 20:23:18 to 20:29:58 GMT and a roll angle of -10.4528 degrees.

The next Aqua Drag Make-up maneuver is scheduled for April 24th, 2003 at approximately 16:49 GMT.

The Deep Space Calibration pitch maneuver(s) are still postponed pending the results of the Terra Deep Space Calibration maneuvers currently planned for March 26 and April 14, 2003.

MODIS Anomalies:

Recent SRCA calibrations have shown that SRCA lamp #2 is not producing the same output characteristics as the other SRCA 10 Watt lamps. Upcoming SRCA Full Radiometric and Full Spatial calibrations will use the backup lamp (#4) in lieu of lamp #2. After the data are analyzed, a decision will be made regarding which 10W lamps to use for the nominal schedule of SRCA calibrations.

The test review for the second Aqua Bus Scheduler Task (BST) patch was conducted on Wednesday, April 9th, 2003. The Command Authorization Meeting (CAM) for this patch is planned for Monday, April 14th and if approved, the patch will be loaded on Tuesday, April 15th.

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally and the radiative cooler temperatures have stabilized.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/links/links.htm

Limited Life Item Status:

SRCA 10W Lamp #1: 215.6 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 187.1 of 500 hours
SRCA 10W Lamp #4: 58.4 of 500 hours

SRCA 1W Lamp #1: 503.2 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours

Solar Diffuser Door: 1990 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements