Mission Operations Days: 2003/116 to 2003/122
April 26, 2003 00:00:00 GMT to May 02, 2003 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, April 26, 2003
None
Sunday, April 27, 2003
None
Monday, April 28, 2003
2003/118 13:28:50-13:29:06 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/118 13:29:50-14:21:31 MCL MOD_OA22_SRCA_FULL_SPECTRAL_1.1 SRCA Full Spectral, Part 1 - B Side Data Collect centered on S/C Night (13:46:40-14:20:35)
2003/118 15:25:15-15:59:46 MCL MOD_OA22_SRCA_FULL_SPECTRAL_2.1 SRCA Full Spectral, Part 2 - B Side Data Collect centered on S/C Night (15:25:33-15:59:28)
2003/118 16:46:41-16:46:57 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/118 16:47:41-17:38:41 MCL MOD_OA22_SRCA_FULL_SPECTRAL_3.1 SRCA Full Spectral, Part 3 - B Side Data Collect centered on S/C Night (17:04:27-17:38:22)
2003/118 18:41:17-19:19:18 MCL MOD_OA22_SRCA_FULL_SPECTRAL_4.1 SRCA Full Spectral, Part 4 - B Side Data Collect centered on S/C Night (18:43:20-19:17:15)
2003/118 20:53:19-21:07:17 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B Side
2003/118 22:32:12-22:46:10 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B Side
Tuesday, April 29, 2003
2003/119 01:00:00 MCL MOD_BB_TEMP_SET_270K_B.1 BB Temp Set to 270K for CP B Coefficients
2003/119 19:00:00 MCL MOD_BB_TEMP_SET_280K_B.1 BB Temp Set to 280K for CP B Coefficients
2003/119 23:00:00 MCL MOD_BB_TEMP_SET_285K_B.1 BB Temp Set to 285K for CP B Coefficients
Wednesday, April 30, 2003
2003/120 02:00:00 MCL MOD_BB_TEMP_SET_290K_B.1 BB Temp Set to 290K for CP B Coefficients
2003/120 06:00:00 MCL MOD_BB_TEMP_SET_315K_B.1 BB Temp Set to 315K for CP B Coefficients
2003/120 06:00:30 MCL MOD_BB_DCYCLE_FULL.1 BB Duty Cycle set to FULL
2003/120 10:00:00 MCL MOD_BB_TEMP_SET_270K_B.1 BB Temp Set to 270K for CP B Coefficients
2003/120 10:00:30 MCL MOD_BB_DCYCLE_THIRD.1 BB Duty Cycle set to THIRD
Thursday, May 1, 2003
2003/121 06:00:00 MCL MOD_BB_TEMP_SET_285K_B.1 BB Temp Set to 285K for CP B Coefficients
Friday, May 2, 2003
None
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
May calibrations for the FM1 MODIS instrument include bimonthly SRCA Spatial, monthly SRCA Radiometric, a Lunar Calibration Roll, and weekly SD/SDSM calibrations.
Maneuvers:
The next FM1 MODIS Lunar Calibration via Spacecraft Roll Maneuver is May 12, 2003 (DOY 2003/132) with data collection from 05:55:36 to 06:02:06 GMT and a roll angle of -6.7176 degrees.
The Aqua Drag Make-up maneuver was successfully executed on April 24, 2003 at approximately 16:49 GMT.
The Deep Space Calibration pitch maneuver(s) are still postponed pending the results of the Terra Deep Space Calibration maneuvers which took place on March 26 and April 14, 2003.
MODIS Anomalies:
Recent SRCA calibrations have shown that SRCA lamp #2 is not producing the same output characteristics as the other SRCA 10 Watt lamps. Upcoming SRCA Full Radiometric and Full Spatial calibrations will use the backup lamp (#4) in lieu of lamp #2. The SRCA Cross Talk Calibration has also made use of this backup lamp configuration. After the data are analyzed, a decision will be made regarding which 10W lamps to use for the nominal schedule of SRCA calibrations.
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally and the radiative cooler temperatures have stabilized.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 218.8 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 188.8 of 500 hours
SRCA 10W Lamp #4: 60.1 of 500 hours
SRCA 1W Lamp #1: 503.4 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours
Solar Diffuser Door: 2008 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements