Mission Operations Days: 2003/200 to 2003/206
July 19, 2003 00:00:00 GMT to July 25, 2003 00:00:00 GMT


Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week’s Completed MODIS Activities:

Saturday, July 19, 2003

None

Sunday, July 20, 2003

None

Monday, July 21, 2003

2003/202 20:30:13-20:44:11 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B Side
2003/202 21:28:55-21:29:11 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/202 21:29:55-22:04:07 MCL MOD_OA19_SRCA_FULL_RAD.1 OA-19: SRCA Full Radiometric Calibration - B Side
Data Collect Centered on S/C Night (21:37:49-22:12:07)
2003/202 22:09:06-22:23:04 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B Side

Tuesday, July 22, 2003

2003/203 15:27:51-15:28:07 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/203 15:28:51-16:20:32 MCL MOD_OA22_SRCA_FULL_SPECTRAL_1.1 OA-22: SRCA Full Spectral, Part 1 - B Side
Data Collect centered on S/C Night (15:45:30-16:19:47)
2003/203 17:24:16-17:58:47 MCL MOD_OA22_SRCA_FULL_SPECTRAL_2.1 OA-22: SRCA Full Spectral, Part 2 - B Side
Data Collect centered on S/C Night (17:24:23-17:58:40)
2003/203 18:45:40-18:45:56 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/203 18:46:40-19:37:40 MCL MOD_OA22_SRCA_FULL_SPECTRAL_3.1 OA-22: SRCA Full Spectral, Part 3 - B Side
Data Collect centered on S/C Night (19:03:15-19:37:33)
2003/203 20:40:16-21:18:17 MCL MOD_OA22_SRCA_FULL_SPECTRAL_4.1 OA-22: SRCA Full Spectral, Part 4 - B Side
Data Collect centered on S/C Night (20:42:08-21:16:25)

Wednesday, July 23, 2003

2003/204 21:05:03-21:05:19 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/204 21:06:03-22:02:59 MCL MOD_OA23_SRCA_FULL_SPAT.1 OA-23: SRCA Full Spatial Calibration - B Side
Data Collect Centered on S/C Night (21:25:20-21:59:36)

Thursday, July 24, 2003

None

Friday, July 25, 2003

None

This Week’s Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

July calibrations will include biweekly SDSM, an SRCA Full Radiometric, an SRCA Full Spatial, an SRCA Full Spectral, a blackbody heated, and a lunar roll calibration.

Saturday, July 26, 2003

None

Sunday, July 27, 2003

None

Monday, July 28, 2003

2003/209 01:00:00 MCL MOD_BB_TEMP_SET_270K_B.1 BB Temp Set to 270K for CP B Coefficients
2003/209 19:00:00 MCL MOD_BB_TEMP_SET_280K_B.1 BB Temp Set to 280K for CP B Coefficients
2003/209 23:00:00 MCL MOD_BB_TEMP_SET_285K_B.1 BB Temp Set to 285K for CP B Coefficients

Tuesday, July 29, 2003

2003/210 02:00:00 MCL MOD_BB_TEMP_SET_290K_B.1 BB Temp Set to 290K for CP B Coefficients
2003/210 06:00:00 MCL MOD_BB_TEMP_SET_315K_B.1 BB Temp Set to 315K for CP B Coefficients
2003/210 06:00:30 MCL MOD_BB_DCYCLE_FULL.1 BB Duty Cycle set to FULL
2003/210 10:00:00 MCL MOD_BB_TEMP_SET_270K_B.1 BB Temp Set to 270K for CP B Coefficients
2003/210 10:00:30 MCL MOD_BB_DCYCLE_THIRD.1 BB Duty Cycle set to THIRD

Wednesday, July 30, 2003

2003/211 06:00:00 MCL MOD_BB_TEMP_SET_285K_B.1 BB Temp Set to 285K for CP B Coefficients

Thursday, July 31, 2003

None

Friday, August 1, 2003

None

Maneuvers:

There will be no MODIS Lunar Calibration Roll in August. The required roll angle is -25.28 (the limit is -20.0).

Initial planning has begun for an Aqua inclination adjustment maneuvers tentatively planned for August 12, 2003 and October 2, 2003. The August 12th maneuver will be a demonstration consisting of the yaw to the offset pointing required to change the orbit inclination, but will not include thruster firings at that offset. The October 2nd maneuver will be the real inclination adjustment event.

No official date has yet been scheduled for the Aqua Deep Space Calibration pitch maneuver(s).

MODIS Anomalies:

None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/links/links.htm

There was an X-Band Data Loss at 2003/192 10:48:35. 50 seconds of MODIS/AIRS observation data was lost. The data is non-recoverable.

Limited Life Item Status:

SRCA 10W Lamp #1: 222.3 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 191.0 of 500 hours
SRCA 10W Lamp #4: 62.3 of 500 hours

SRCA 1W Lamp #1: 504.0 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours

Solar Diffuser Door: 2074 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements