Mission Operations Days: 2003/228 to 2003/234
August 16, 2003 00:00:00 GMT to August 22, 2003 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, August 16, 2003
None
Sunday, August 17, 2003
None
Monday, August 18, 2003
2003/230 20:52:35-21:06:33 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B Side
2003/230 21:40:00-21:40:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/230 21:45:26-22:19:39 MCL MOD_OA19_SRCA_FULL_RAD.1 OA-19: SRCA Full Radiometric Calibration - B Side Data Collect begins 60 seconds after start of S/C Night (22:00:20-22:34:22)
2003/230 22:31:28-22:45:26 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B Side
Tuesday, August 19, 2003
2003/231 00:15:07-00:17:38 MCL MOD_OA27_PV_ECAL.1 OA27: Photovoltaic bands electronics calibration
Wednesday, August 20, 2003
None
Thursday, August 21, 2003
2003/233 23:25:08-23:25:50 R-T MOD_MEM_PM_DUMP(‘motor_constants’,35,0,0,1,2) Memory dump of MODIS table #16
2003/233 23:27:30-23:28:14 R-T MOD_MEM_PM_DUMP(‘motor_trigger_data’,60,0,0,1,2) Memory dump of MODIS table #17
2003/233 23:29:53-23:30:24 R-T MOD_MEM_PM_DUMP(‘motor_pos_when_hit’,12,0,0,1,1) Memory dump of MODIS table #18
2003/233 23:32:17-23:32:47 R-T MOD_MEM_PM_DUMP(‘door_data’,12,0,0,1,1) Memory dump of MODIS table #20
Friday, August 22, 2003
None
This Week's Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
September calibrations will include biweekly SDSM, monthly SRCA Full Radiometric, and bimonthly SRCA Full Spatial.
Maneuvers:
There will be no Aqua MODIS Lunar Calibration Roll in September of 2003. The required angle to roll would be -27.18 degrees (the limit is -20.0).
The Aqua inclination adjustment maneuver is being planned for October 7, 2003 (previously was October 2, 2003). The maneuver is to be performed completely in eclipse. Once again, contingency activities will be scheduled to close the MODIS nadir and space view doors in the event that the spacecraft does not return to nominal pointing. If the maneuver is successful, the commands to close the MODIS doors will be inhibited.
No official date has yet been scheduled for the Aqua Deep Space Calibration pitch maneuver(s).
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 222.5 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 191.1 of 500 hours
SRCA 10W Lamp #4: 62.4 of 500 hours
SRCA 1W Lamp #1: 504.1 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours
Solar Diffuser Door: 2092 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements