Skip to main content

MCST Banner Image

pm1weekly_2003-284_2003-290

Mission Operations Days: 2003/284 to 2003/290
October 11, 2003 00:00:00 GMT to October 17, 2003 00:00:00 GMT


Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week's Completed MODIS Activities:

Saturday, October 11, 2003

None

Sunday, October 12, 2003

None

Monday, October 13, 2003

2003/286 21:36:31-21:50:29 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B Side
2003/286 22:35:00-22:35:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/286 22:36:14-23:10:26 MCL MOD_OA19_SRCA_FULL_RAD.1 OA-19: SRCA Full Radiometric Calibration - B Side Data Collect Centered on S/C Night (22:52:08-23:10:26)
2003/286 23:15:24-23:29:22 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B Side

Tuesday, October 14, 2003

2003/287 00:15:33-00:18:04 MCL MOD_OA27_PV_ECAL.1 OA-27: Photovoltaic bands electronics calibration
2003/287 16:34:00-16:34:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/287 16:35:09-17:26:50 MCL MOD_OA22_SRCA_FULL_SPECTRAL_1.1 OA-22: SRCA Full Spectral, Part 1 - B Side Data Collect centered on S/C Night (16:51:03-17:26:50)
2003/287 18:30:33-19:05:04 MCL MOD_OA22_SRCA_FULL_SPECTRAL_2.1 OA-22: SRCA Full Spectral, Part 2 - B Side Data Collect centered on S/C Night (18:30:33-19:05:04)
2003/287 19:52:00-19:52:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/287 19:52:58-20:43:57 MCL MOD_OA22_SRCA_FULL_SPECTRAL_3.1 OA-22: SRCA Full Spectral, Part 3 - B Side Data Collect centered on S/C Night (20:09:25-20:43:57)
2003/287 21:46:34-22:24:34 MCL MOD_OA22_SRCA_FULL_SPECTRAL_4.1 OA-22: SRCA Full Spectral, Part 4 - B Side Data Collect centered on S/C Night (21:46:34-22:24:34)

Wednesday, October 15, 2003

None

Thursday, October 16, 2003

None

Friday, October 17, 2003

None

This Week's Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

October calibrations will include biweekly SDSM, monthly SRCA Full Radiometric, and quarterly SRCA Full Spectral and Blackbody calibrations. In addition, a full set of memory table dumps will be gathered.

A request for a Day Rate collection over Night Ground Track has been made. This request will be completed once SSR buffer management times have been worked out with the Flight Operations Team.

Maneuvers:

The Aqua MODIS Lunar Calibration Roll in November will happen on DOY 2003/308 (November 4, 2003). At 09:23:47-09:30:17 GMT. The roll angle will be -13.73 degrees.

The Aqua Inclination Adjustment Maneuver took place on October 7, 2003. The maneuver executed as expected. As a result, no Drag Make-Up Maneuver was necessary on October 9, 2003.

No official date has yet been scheduled for the Aqua Deep Space Calibration pitch maneuver(s).

MODIS Anomalies:

None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/links/links.htm

Limited Life Item Status:

SRCA 10W Lamp #1: 225.5 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 192.9 of 500 hours
SRCA 10W Lamp #4: 64.2 of 500 hours

SRCA 1W Lamp #1: 504.4 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours

Solar Diffuser Door: 2116 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements