Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week's Completed MODIS Activities:

Saturday, November 1, 2003

None

Sunday, November 2, 2003

2003/306 01:00:00 MCL MOD_BB_TEMP_SET_270K_B.1 BB Temp Set to 270K for CP B Coefficients
2003/306 19:00:00 MCL MOD_BB_TEMP_SET_280K_B.1 BB Temp Set to 280K for CP B Coefficients
2003/306 23:00:00 MCL MOD_BB_TEMP_SET_285K_B.1 BB Temp Set to 285K for CP B Coefficients

Monday, November 3, 2003

2003/307 02:00:00 MCL MOD_BB_TEMP_SET_290K_B.1 BB Temp Set to 290K for CP B Coefficients
2003/307 06:00:00 MCL MOD_BB_TEMP_SET_315K_B.1 BB Temp Set to 315K for CP B Coefficients
2003/307 06:00:30 MCL MOD_BB_DCYCLE_FULL.1 BB Duty Cycle set to FULL
2003/307 10:00:00 MCL MOD_BB_TEMP_SET_270K_B.1 BB Temp Set to 270K for CP B Coefficients
2003/307 10:00:30 MCL MOD_BB_DCYCLE_THIRD.1 BB Duty Cycle set to THIRD

Tuesday, November 4, 2003

2003/308 06:00:00 MCL MOD_BB_TEMP_SET_285K_B.1 BB Temp Set to 285K for CP B Coefficients

Lunar Roll Manuever (-13.73 degree roll)
2003/308 07:56:21 MCL MOD_OA03_FR_DAY_RATE.1 (NADIR Terminator Crossing to DAY + 00:00:00)
2003/308 08:42:35 MCL MOD_OA03_FR_NIGHT_RATE.2 (NADIR Terminator Crossing to NIGHT - 00:03:23)
2003/308 09:23:39-09:30:25 MCL MOD_OA08_ROLL_MAN.1
2003/308 09:23:39 MCL PM1_SCS_ISC_81_MOD_OA08_ROLL_MAN_START_V1
2003/308 09:23:49 FR RATE to DAY
2003/308 09:23:41 FR SCI Flag set to ABNORM
2003/308 09:23:43 FR PC DC Restore set to OFF
2003/308 09:23:45 FR PV DC Restore set to OFF
2003/308 09:23:47 FR Encoder Delta to -3072
2003/308 09:23:47-09:30:17 Lunar View through Space View Port
2003/308 09:30:17 MCL PM1_SCS_ISC_82_MOD_OA08_ROLL_MAN_END_V1
2003/308 09:30:17 FR Encoder Delta to 0
2003/308 09:30:19 FR PC DC Restore set to ON
2003/308 09:30:21 FR PV DC Restore set to ON
2003/308 09:30:23 FR SCI Flag set to NORM
2003/308 09:30:25 FR RATE to NIGHT
2003/308 09:38:36 MCL MOD_OA03_FR_DAY_RATE.1 (NADIR Terminator Crossing to DAY + 00:03:23)
2003/308 10:24:50 MCL MOD_OA03_FR_NIGHT_RATE.2 (NADIR Terminator Crossing to NIGHT + 00:00:00)

The MOD_OA03_FR_DAY/NIGHT_RATE.1/2 activities are scheduled to balance the FR Data Rate to 50%/50% Day/Night per orbit for the maneuver. They replace the two regularly scheduled activities, MOD_OA03_FR_DAY_NIGHT_SINGLE.1 (ISC SCS 56), at 2003/308 07:56:21 and 2003/308 09:35:13.

Wednesday, November 5, 2003

None

Thursday, November 6, 2003

None

Friday, November 7, 2003

None

This Week's Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Calibrations for November include bimonthly SRCA Full Spatial, monthly SRCA Full Radiometric, and biweekly SD/SDSM. An additional request has been made to repeat the full orbit SRCA Radiometric Continuous 10W and 1W collections that were performed on DOY 2003/029 and 2003/032. These have been scheduled to occur on DOY 2003/318 (see below).

Monday, November 10, 2003

2003/314 20:19:27-20:33:25 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B Side
2003/314 21:15:00-21:15:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/314 21:19:12-21:53:24 MCL MOD_OA19_SRCA_FULL_RAD.1 OA-19: SRCA Full Radiometric Calibration - B Side Data Collect Centered on S/C Night (21:35:05-21:53:24)
2003/314 21:58:20-22:12:18 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B Side

Friday, November 14, 2003

2003/318 00:51:12-00:51:28 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/318 00:52:18-02:57:35 MCL MOD_OA20_SRCA_10W_RAD.4 OA-20: SRCA 10W Radiometric (Continuous) Begins 15:54 prior to S/C Night, Orbit 8138 Data collection 01:08:12-02:57:35 (1 Orbit + 10:00)
2003/318 20:37:47-20:38:03 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/318 20:38:53-22:44:10 MCL MOD_OA21_SRCA_1W_RAD.2 OA-21: SRCA 1W Radiometric (Continuous) Begins 15:54 prior to S/C Night, Orbit 8150 Data collection 20:54:47-22:44:10 (1 Orbit + 10:00)

Maneuvers:

The Aqua MODIS Lunar Calibration Roll for November happened on DOY 2003/308 (November 4, 2003), at 09:23:47-09:30:17 GMT. The roll angle was be -13.73 degrees. The Aqua MODIS Lunar Calibration Roll for December is planned for DOY 2003/ 337 (December 3, 2003), at 18:40:00-18:46:30 GMT. The roll angle will be -2.2617 degrees.

Aqua performed a Drag Make-Up (DMU) Maneuver on DOY 2003/308 (Wednesday, November 5, 2003). The slew out time (and loss of pointing accuracy) was at 13:19 GMT. The burn occurred at 15:00 GMT and lasted for approximately 103 seconds. The slew return time was at 15:41 GMT, and point accuracy was regained at 15:56 GMT.

No official date has yet been scheduled for the Aqua Deep Space Calibration pitch maneuver(s).

MODIS Anomalies:

None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/links/links.htm

Limited Life Item Status:

SRCA 10W Lamp #1: 225.5 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 192.9 of 500 hours
SRCA 10W Lamp #4: 64.2 of 500 hours

SRCA 1W Lamp #1: 504.4 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours

Solar Diffuser Door: 2122 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements