Mission Operations Days: 2004/031 to 2004/037
January 31, 2004 00:00:00 GMT to February 06, 2004 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, January 31, 2004
2004/031 01:00:00-01:00:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2004/031 01:09:48-02:01:30 MCL MOD_OA22_SRCA_FULL_SPECT_1.1 OA-22: SRCA Full Spectral Calibration Part 1 30W-lamp data collection is from 01:25:42-02:01:29
2004/031 03:05:00-03:39:32 MCL MOD_OA22_SRCA_FULL_SPECT_2.1 OA-22: SRCA Full Spectral Calibration Part 2 30W-lamp data collection is from 03:05:00-03:39:31
2004/031 04:20:00-04:20:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2004/031 04:27:35-05:18:36 MCL MOD_OA22_SRCA_FULL_SPECT_3.1 OA-22: SRCA Full Spectral Calibration Part 3 10W-lamp data collection is from 04:44:02-05:18:35
2004/031 06:21:33-06:59:34 MCL MOD_OA22_SRCA_FULL_SPECT_4.1 OA-22: SRCA Full Spectral Calibration Part 4 10W-lamp data collection is from 06:21:33-06:59:33
Sunday, February 1, 2004
Lunar Roll Maneuver (-11.0270 degree roll)
2004/032 11:07:56 MCL MOD_OA03_FR_DAY_RATE
2004/032 11:54:00 MCL MOD_OA03_FR_NIGHT_RATE (03:23 early)
2004/032 11:57:02 RT Aqua FOT commands S/C to low fidelity pointing
2004/032 12:06:56-12:13:42 MCL MOD_OA08_ROLL_MAN
2004/032 12:26:36 RT Aqua FOT commands S/C to high fidelity pointing
2004/032 12:50:12 MCL MOD_OA03_FR_DAY_RATE (03:23 late)
2004/032 13:36:16 MCL MOD_OA03_FR_NIGHT_RATE
Monday, February 2, 2004
2004/033 21:34:04-21:48:02 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened – B-Side
2004/033 23:12:58-23:26:56 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open – B-Side
Tuesday, February 3, 2004
None
Wednesday, February 4, 2004
Door Table Memory Dumps
2004/035 22:15:28-22:16:10 RT MOD_MEM_PM_DUMP('motor_constants',35,0,0,1,2)
2004/035 22:16:27-22:17:07 RT MOD_MEM_PM_DUMP('motor_trigger_data',60,0,0,1,2)
2004/035 22:17:22-22:17:51 RT MOD_MEM_PM_DUMP('motor_pos_when_hit',12,0,0,1,1)
2004/035 22:18:06-22:18:36 RT MOD_MEM_PM_DUMP('door_data',12,0,0,1,1)
Thursday, February 5, 2004
None
Friday, February 6, 2004
None
This Week's Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for February include SRCA Full Radiometric, PV Ecal, Biweekly SD/SDSM Calibrations, Door Table Dumps, and Lunar Calibrations.
Maneuvers:
The next Aqua MODIS Lunar Calibration Roll will be scheduled for 2004/062 (March 2, 2004). Data collect time is 07:24:18 to 07:30:48 GMT. The roll angle will be -14.1956 degrees.
The second Aqua Inclination Adjust Maneuver (IAM#2) will occur on 2004/075 (March 15, 2004).
No official date has yet been scheduled for the Aqua Deep Space Calibration pitch maneuver(s).
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 229.0 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 195.1 of 500 hours
SRCA 10W Lamp #4: 68.3 of 500 hours
SRCA 1W Lamp #1: 506.9 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours
Solar Diffuser Door: 2164 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements