Mission Operations Days: 2004/206 to 2004/212
July 24, 2004 00:00:00 GMT to July 30, 2004 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, July 24, 2004
None
Sunday, July 25, 2004
None
Monday, July 26, 2004
None
Tuesday, July 27, 2004
2004/209 01:00:00-01:00:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2004/209 01:09:15-02:00:57 MCL MOD_OA22_SRCA_FULL_SPECT_1.1 OA-22: SRCA Full Spectral Calibration Part 1 30W-lamp data collection is from 01:25:09-02:00:56
2004/209 03:04:59-03:39:31 MCL MOD_OA22_SRCA_FULL_SPECT_2.1 OA-22: SRCA Full Spectral Calibration Part 2 30W-lamp data collection is from 03:04:59-03:39:30
2004/209 04:20:00-04:20:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2004/209 04:27:01-05:18:02 MCL MOD_OA22_SRCA_FULL_SPECT_3.1 OA-22: SRCA Full Spectral Calibration Part 3 10W-lamp data collection is from 04:43:28-05:18:01
2004/209 06:21:02-06:59:03 MCL MOD_OA22_SRCA_FULL_SPECT_4.1 OA-22: SRCA Full Spectral Calibration Part 4 10W-lamp data collection is from 06:21:02-06:59:02
Wednesday, July 28, 2004
None
Thursday, July 29, 2004
None
Friday, July 30, 2004
2004/212 17:39:26-17:41:10 Real-Time MOD_MEM_PM_DUMP('motor_constants',35,0,0,1,2)
2004/212 17:42:04-17:43:01 Real-Time MOD_MEM_PM_DUMP('motor_trigger_data',60,0,0,1,2)
2004/212 17:43:28-17:44:08 Real-Time MOD_MEM_PM_DUMP('motor_pos_when_hit',12,0,0,1,1)
2004/212 17:44:34-17:45:15 Real-Time MOD_MEM_PM_DUMP('door_data',12,0,0,1,1)
This Week's Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for July will include biweekly SDSM, monthly SRCA Full Radiometric, bimonthly SRCA Spatial, and quarterly Black Body and SRCA Spectral calibrations.
Monday, August 2, 2004
2004/215 21:08:00-21:21:58 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B-Side
2004/215 22:46:52-23:00:50 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B-Side
Tuesday, August 3, 2004
2004/216 01:00:00-01:00:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2004/216 01:17:29-01:51:42 MCL MOD_OA19_SRCA_FULL_RAD.1 OA-19: SRCA Full Radiometric Calibration - B Side Data Collect (01:33:23-01:51:41)
Maneuvers:
There will be no Aqua MODIS Lunar Calibration Roll in July 2004. The necessary roll angle is -24.3533 degrees (exceeding the -20.0 degree limit).
No official date has yet been scheduled for the Aqua Deep Space Calibration pitch maneuver(s).
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 235.7 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 199.3 of 500 hours
SRCA 10W Lamp #4: 72.4 of 500 hours
SRCA 1W Lamp #1: 507.9 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours
Solar Diffuser Door: 2236 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements