Mission Operations Days: 2004/213 to 2004/219
July 31, 2004 00:00:00 GMT to August 06, 2004 00:00:00 GMT


Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week’s Completed MODIS Activities:

Saturday, July 31, 2004

None

Sunday, August 1, 2004

None

Monday, August 2, 2004

2004/215 21:08:00-21:21:58 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B-Side
2004/215 22:46:52-23:00:50 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B-Side

Tuesday, August 3, 2004

2004/216 01:00:00-01:00:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2004/216 01:17:29-01:51:42 MCL MOD_OA19_SRCA_FULL_RAD.1 OA-19: SRCA Full Radiometric Calibration - B Side Data Collect (01:33:23-01:51:41)

Wednesday, August 4, 2004

None

Thursday, August 5, 2004

Aqua Drag Makeup Maneuver
2004/218 09:46:00 Loss of pointing accuracy
2004/218 11:36:00 Regain pointing accuracy

Friday, August 6, 2004

None

This Week’s Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Calibrations for August will include biweekly SDSM and bimonthly PV Ecal.

Saturday, August 7, 2004

2004/220 00:52:11-00:54:42 MCL MOD_OA27_PV_ECAL.1 OA-27: Photovoltaic bands electronics calibration

Maneuvers:

There will be no Aqua MODIS Lunar Calibration Roll in August 2004. The necessary roll angle is –28.1151 degrees (exceeding the -20.0 degree limit).

No official date has yet been scheduled for the Aqua Deep Space Calibration pitch maneuver(s).

MODIS Anomalies:

None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/links/links.htm

Limited Life Item Status:

SRCA 10W Lamp #1: 235.8 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 199.4 of 500 hours
SRCA 10W Lamp #4: 72.6 of 500 hours

SRCA 1W Lamp #1: 508.0 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours

Solar Diffuser Door: 2242 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements