Skip to main content

MCST Banner Image

pm1weekly_2004-220_2004-226

Mission Operations Days: 2004/220 to 2004/226
August 07, 2004 00:00:00 GMT to August 13, 2004 00:00:00 GMT


Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week’s Completed MODIS Activities:

Saturday, August 7, 2004

2004/220 00:52:11-00:54:42 MCL MOD_OA27_PV_ECAL.1 OA-27: Photovoltaic bands electronics calibration

Sunday, August 8, 2004

None

Monday, August 9, 2004

None

Tuesday, August 10, 2004

None

Wednesday, August 11, 2004

None

Thursday, August 12, 2004

None

Friday, August 13, 2004

2004/226 15:22:25-15:23:14 Real-Time MOD_MEM_PM_DUMP('motor_constants',35,0,0,1,2)
2004/226 15:23:19-15:24:11 Real-Time MOD_MEM_PM_DUMP('motor_trigger_data',60,0,0,1,2)
2004/226 15:24:25-15:25:01 Real-Time MOD_MEM_PM_DUMP('motor_pos_when_hit',12,0,0,1,1)
2004/226 15:25:16-15:25:53 Real-Time MOD_MEM_PM_DUMP('door_data',12,0,0,1,1)

This Week’s Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Calibrations for August will include biweekly SDSM.

Monday, August 16, 2004

2004/229 21:19:21-21:33:19 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B-Side
2004/229 22:58:13-23:12:11 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B-Side

Maneuvers:

There will be no Aqua MODIS Lunar Calibration Roll in August 2004. The necessary roll angle is –28.1151 degrees (exceeding the -20.0 degree limit).

No official date has yet been scheduled for the Aqua Deep Space Calibration pitch maneuver(s).

MODIS Anomalies:

None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/links/links.htm

Limited Life Item Status:

SRCA 10W Lamp #1: 235.8 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 199.4 of 500 hours
SRCA 10W Lamp #4: 72.6 of 500 hours

SRCA 1W Lamp #1: 508.0 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours

Solar Diffuser Door: 2242 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements