Mission Operations Days: 2004/255 to 2004/261
September 11, 2004 00:00:00 GMT to September 17, 2004 00:00:00 GMT


Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week's Completed MODIS Activities:

Saturday, September 11, 2004

None

Sunday, September 12, 2004

None

Monday, September 13, 2004

2004/257 20:02:30-20:16:28 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B-Side
2004/257 21:41:23-21:55:21 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B-Side

Tuesday, September 14, 2004

2004/258 00:05:00-00:05:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2004/258 00:12:22-00:46:35 MCL MOD_OA19_SRCA_FULL_RAD.1 OA-19: SRCA Full Radiometric Calibration - B Side Data Collect (00:28:16-00:46:34)
2004/258 08:20:00-08:20:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2004/258 08:26:46-09:24:16 MCL MOD_OA23_FULL_SPAT.1 OA-23: SRCA Full Spatial Calibration - B Side Data Collect (08:42:40-09:23:42)

2004/258 15:18:11-15:49:31 Inclination Adjustment Maneuver (IAM) #3

Wednesday, September 15, 2004

None

Thursday, September 16, 2004

None

Friday, September 17, 2004

None

This Week's Scheduled MODIS Activities Not Completed:

For Aqua Inclination Adjust Maneuver (#3)
2004/258 15:50:08-15:50:11 MCL MOD_NAD_AND_SVD_TO_CLOSED.1
Scheduled 90 seconds prior to S/C Day (15:51:38)

Upcoming MODIS Events:

Calibrations for September include biweekly SDSM, monthly SRCA Full Radiometric, and bimonthly SRCA Full Spatial.

For Aqua Inclination Adjust Maneuver (#4)
2004/265 15:55:25-15:56:25 MCL MOD_NAD_AND_SVD_TO_CLOSED.1
Scheduled 90 seconds prior to S/C Day (15:56:55)

Maneuvers:

There will be no Aqua MODIS Lunar Calibration Roll in September 2004. The necessary roll angle is greater than -25 degrees (exceeding the -20.0 degree limit).

The Aqua satellite will be executing a series of five additional (there have already been 2 for Aqua) Inclination Adjust Maneuvers (IAM) between DOY 2004/258 and 2004/317 (September 14, 2004 and November 12, 2004, respectively). The planned dates for each maneuver (exact time and duration for each to be updated as the events draw near):

2004/258 (September 14, 2004) IAM #3 Executed: 15:18:11-15:49:31 slewed off nominal pointing 550 second thruster burn
2004/265 (September 21, 2004) IAM #4 Planned: 15:23:36-15:54:56 slewed off nominal pointing 550 second thruster burn
2004/272 (September 28, 2004) IAM #5
2004/279 (October 5, 2004) IAM #6
2004/286 (October 12, 2004) IAM #7

No official date has yet been scheduled for the Aqua Deep Space Calibration pitch maneuver(s).

MODIS Anomalies:

None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/links/links.htm

Limited Life Item Status:

SRCA 10W Lamp #1: 236.3 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 199.8 of 500 hours
SRCA 10W Lamp #4: 73.0 of 500 hours

SRCA 1W Lamp #1: 508.3 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours

Solar Diffuser Door: 2260 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements