pm1weekly_2004-276_2004-282

Mission Operations Days: 2004/276 to 2004/282
October 02, 2004 00:00:00 GMT to October 08, 2004 00:00:00 GMT


Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week's Completed MODIS Activities:

Saturday, October 2, 2004

None

Sunday, October 3, 2004

None

Monday, October 4, 2004

None

Tuesday, October 5, 2004

2004/279 15:34:22-16:05:42 Inclination Adjustment Maneuver (IAM) #6

Wednesday, October 6, 2004

None

Thursday, October 7, 2004

None

Friday, October 8, 2004

2004/282 14:36:02-14:36:52 Real-Time MOD_MEM_PM_DUMP('motor_constants',35,0,0,1,2)
2004/282 14:37:25-14:38:12 Real-Time MOD_MEM_PM_DUMP('motor_trigger_data',60,0,0,1,2)
2004/282 14:38:40-14:39:18 Real-Time MOD_MEM_PM_DUMP('motor_pos_when_hit',12,0,0,1,1)
2004/282 14:39:40-14:40:16 Real-Time MOD_MEM_PM_DUMP('door_data',12,0,0,1,1)

This Week's Scheduled MODIS Activities Not Completed:

For Aqua Inclination Adjust Maneuver (#6)
2004/279 16:05:53-16:06:53 MCL MOD_NAD_AND_SVD_TO_CLOSED.1
Scheduled 90 seconds prior to S/C Day (16:07:23)

Upcoming MODIS Events:

Calibrations for October include biweekly SDSM, monthly SRCA Full Radiometric, bimonthly PV Ecal, quarterly SRCA Full Spectral, and quarterly Blackbody.

A request by MCST has been made to perform SRCA 10W and 1W continuous mode Radiometric observations. These activities will be coordinated for the first half of October. These tests will be similar to the ones perform in October 2003.

Monday, October 11, 2004

2004/285 21:23:51-21:26:22 MCL MOD_OA27_PV_ECAL.1 OA-27: Photovoltaic bands electronics calibration
2004/285 22:02:44-22:16:42 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B-Side
2004/285 23:41:37-23:55:35 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B-Side
2004/286 00:39:00-00:39:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2004/286 00:40:51-01:16:00 MCL MOD_OA19_SRCA_FULL_RAD.1 OA-19: SRCA Full Radiometric Calibration - B Side Data collection from 00:56:45-01:16:00 Spacecraft Night from 00:49:55-01:22:50

For Aqua Inclination Adjust Maneuver (#7)
2004/286 16:11:13-16:12:13 MCL MOD_NAD_AND_SVD_TO_CLOSED.1
Scheduled 90 seconds prior to S/C Day (16:12:43)

Maneuvers:

The next Aqua MODIS Lunar Calibration Roll will be on DOY 2004/297 (October 23, 2004). The roll angle will be -16.6865 degrees for a nominal 6:30 (390 second) collection.

The Aqua satellite will be executing a series of five additional (there have already been 2 for Aqua) Inclination Adjust Maneuvers (IAM) between DOY 2004/258 and 2004/317 (September 14, 2004 and November 12, 2004, respectively). The planned dates for each maneuver (exact time and duration for each to be updated as the events draw near):

2004/258 (September 14, 2004) IAM #3 Executed: 15:18:11-15:49:31 slewed off nominal pointing 550 second thruster burn
2004/265 (September 21, 2004) IAM #4 Executed: 15:23:36-15:54:56 slewed off nominal pointing 550 second thruster burn
2004/272 (September 28, 2004) IAM #5 Executed: 15:28:59-16:00:19 slewed off nominal pointing 550 second thruster burn
2004/279 (October 5, 2004) IAM #6 Executed: 15:34:22-16:05:42 slewed off nominal pointing 550 second thruster burn
2004/286 (October 12, 2004) IAM #7 Planned: 15:39:46-16:11:06 slewed off nominal pointing 550 second thruster burn

No official date has yet been scheduled for the Aqua Deep Space Calibration pitch maneuver(s).

MODIS Anomalies:

None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/links/links.htm

Limited Life Item Status:

SRCA 10W Lamp #1: 236.3 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 199.8 of 500 hours
SRCA 10W Lamp #4: 73.0 of 500 hours

SRCA 1W Lamp #1: 508.3 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours

Solar Diffuser Door: 2266 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements