Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week’s Completed MODIS Activities:

Saturday, December 18, 2004

2004/353 11:03:33-11:06:04 MCL MOD_OA27_PV_ECAL.1 OA-27: Photovoltaic bands electronics calibration

Sunday, December 19, 2004

None

Monday, December 20, 2004

None

Tuesday, December 21, 2004

Lunar Roll Maneuver (-1.4013 degree roll)
2004/356 16:24:29 MCL MOD_OA03_FR_NIGHT_RATE (03:23 early)
2004/356 16:46:30-16:53:16 MCL MOD_OA08_ROLL_MAN
2004/356 17:20:41 MCL MOD_OA03_FR_DAY_RATE (03:23 late)

Wednesday, December 22, 2004

None

Thursday, December 23, 2004

None

Friday, December 24, 2004

None

This Week’s Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Calibrations for December include biweekly SDSM and bimonthly PV ECAL.

Monday, December 27, 2004

2004/363 21:26:19-21:40:17 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B-Side 2004/363 23:05:12-23:19:10 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B-Side

Maneuvers:

No official date has yet been scheduled for the Aqua Deep Space Calibration pitch maneuver(s).

MODIS Anomalies:

None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/links/links.htm

Limited Life Item Status:

SRCA 10W Lamp #1: 239.5 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 201.7 of 500 hours
SRCA 10W Lamp #4: 78.6 of 500 hours

SRCA 1W Lamp #1: 508.7 of 5000 hours
SRCA 1W Lamp #2: 271.6 of 5000 hours

Solar Diffuser Door: 2302 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements