Mission Operations Days: 2005/085 to 2005/091
March 26, 2005 00:00:00 GMT to April 01, 2005 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off | Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, March 26, 2005
None
Sunday, March 27, 2005
None
Monday, March 28, 2005
None
Tuesday, March 29, 2005
None
Wednesday, March 30, 2005
None
Thursday, March 31, 2005
None
Friday, April 1, 2005
2005/091 13:04:05-13:04:51 MOD_MEM_PM_DUMP('motor_constants',35,0,0,1,2)
2005/091 13:05:03-13:05:49 MOD_MEM_PM_DUMP('motor_trigger_data',60,0,0,1,2)
2005/091 13:06:03-13:06:37 MOD_MEM_PM_DUMP('motor_pos_when_hit',12,0,0,1,1)
2005/091 13:06:43-13:07:20 MOD_MEM_PM_DUMP('door_data',12,0,0,1,1)
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for April will include biweekly SDSM, monthly SRCA Full Radiometric, bimonthly PV Ecal, and quarterly SRCA Full Spectral and Black Body.
Monday, April 4, 2005
2005/094 21:22:02-21:36:00 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B-Side
2005/094 23:00:56-23:14:54 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B-Side
Tuesday, April 5, 2005
2005/095 01:20:00-01:20:18 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2005/095 01:31:46-02:05:59 MCL MOD_OA19_SRCA_FULL_RAD.1 OA-19: SRCA Full Radiometric Calibration - B Side
Data Collect from 01:47:40-02:05:58
2005/095 04:52:01-04:54:32 MCL MOD_OA27_PV_ECAL.1 OA-27: Photovoltaic bands electronics calibration
Maneuvers:
The next Aqua MODIS Lunar Calibration Roll will be on DOY 2005/109 (April 19, 2005). The roll angle will be -8.1412 degrees. Data collect will be from 18:34:28-18:40:58.
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 243.0 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 204.0 of 500 hours
SRCA 10W Lamp #4: 80.8 of 500 hours
SRCA 1W Lamp #1: 509.3 of 5000 hours
SRCA 1W Lamp #2: 271.6 of 5000 hours
Solar Diffuser Door: 2354 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements