Mission Operations Days: 2005/218 to 2005/224
August 06, 2005 00:00:00 GMT to August 12, 2005 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
| PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
|---|---|---|
| Component | State(s) | Comment |
| Blackbody | A Off; B On (285K) | Nominal Science Mode |
| Calibration Electronics | A Off; B On | Nominal Science Mode |
| Control Processor | A Off; B On | Nominal Science Mode |
| Nadir Door | Unlatched, Open | Nominal Science Mode |
| Space View Door | Unlatched, Open | Nominal Science Mode |
| Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
| FDDI Formatter | A Off; B On | Nominal Science Mode |
| FDDI Port | A Off; B On | Nominal Science Mode |
| FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
| Format Processor | A Off; B On | Nominal Science Mode |
| Power Supplies | #1 Off, #2 On | Nominal Science Mode |
| PV VIS FPA | A Off; B On | Nominal Science Mode |
| PV NIR FPA | A Off; B On | Nominal Science Mode |
| PV SMIR FPA | A Off; B On | Nominal Science Mode |
| PV LWIR FPA | A Off; B On | Nominal Science Mode |
| PC LWIR FPA | A Off; B On | Nominal Science Mode |
| RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
| RC LWIR FPA Heater | Off | Nominal Science Mode |
| RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
| Scan Assembly | A Off; B On | Nominal Science Mode |
| SDSM | Off | Nominal Science Mode |
| SRCA | Off
|
Nominal Science Mode |
| PS1 Survival Heaters | Enabled | Nominal Science Mode |
| PS2 Survival Heaters | Enabled | Nominal Science Mode |
| Timing Generator | A Off; B On | Nominal Science Mode |
| Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
| Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, August 6, 2005
None
Sunday, August 7, 2005
None
Monday, August 8, 2005
2005/220 21:36:31-21:50:29 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B-Side
2005/220 23:15:24-23:29:22 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B-Side
Tuesday, August 9, 2005
2005/221 01:45:57-01:48:28 MCL MOD_OA27_PV_ECAL.1 OA-27: Photovoltaic bands electronics calibration
Wednesday, August 10, 2005
None
Thursday, August 11, 2005
None
Friday, August 12, 2005
None
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for August will include biweekly SDSM, monthly SRCA Full Radiometric, bimonthly PV Ecal, and quarterly SRCA Full Spatial.
Maneuvers:
There will be no Lunar calibration in August 2005.
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 245.9 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 82.6 of 500 hours
SRCA 1W Lamp #1: 509.5 of 5000 hours
SRCA 1W Lamp #2: 271.6 of 5000 hours
Solar Diffuser Door: 2414 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements