Mission Operations Days: 2005/281 to 2005/287
October 08, 2005 00:00:00 GMT to October 14, 2005 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, October 8, 2005
None
Sunday, October 9, 2005
None
Monday, October 10, 2005
2005/283 19:50:00-19:50:16 MCL MOD_SRCA_SETUP_NO_L2_L3_CC.2 SRCA setup activity using lamp #1 and lamp #4, and in constant current feedback mode.
2005/283 20:00:11-20:47:15 MCL MOD_OA23_FULL_SPAT.2 OA-23: SRCA Full Spatial Calibration - B Side
Data Collect from 20:16:28-20:47:14.
Tuesday, October 11, 2005
None
Wednesday, October 12, 2005
None
Thursday, October 13, 2005
Lunar Roll Maneuver (-19.6645 deg roll)
2005/286 14:52:23-15:38:27 MCL MOD_OA03_FR_DAY_RATE
2005/286 15:38:27-16:19:28 MCL MOD_OA03_FR_NIGHT_RATE (03:23 early)
2005/286 16:19:28-16:26:14 MCL MOD_OA08_ROLL_MAN
2005/286 16:34:39-17:20:43 MCL MOD_OA03_FR_DAY_RATE (03:23 late)
2005/286 17:20:43-18:10:08 MCL MOD_OA03_FR_NIGHT_RATE
Friday, October 14, 2005
2005/287 15:10:00-15:10:52 Real-Time MOD_MEM_PM_DUMP('motor_constants',35,0,0,1,2)
2005/287 15:11:22-15:12:04 Real-Time MOD_MEM_PM_DUMP('motor_trigger_data',60,0,0,1,2)
2005/287 15:12:34-15:13:06 Real-Time MOD_MEM_PM_DUMP('motor_pos_when_hit',12,0,0,1,1)
2005/287 15:13:31-15:14:08 Real-Time MOD_MEM_PM_DUMP('door_data',12,0,0,1,1)
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for October will include biweekly SDSM, bimonthly PV Ecal, and quarterly blackbody.
Monday, October 17, 2005
2005/290 20:52:12-21:06:10 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B-Side
2005/290 22:31:05-22:45:03 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B-Side
Tuesday, October 18, 2005
2005/291 01:08:52-01:11:23 MCL MOD_OA27_PV_ECAL.1 OA-27: Photovoltaic bands electronics calibration
2005/291 03:00:00 MCL MOD_BB_TEMP_SET_270K_B.2 BB Temp Set to 270K for CP B Coefficients
2005/291 21:00:00 MCL MOD_BB_TEMP_SET_280K_B.2 BB Temp Set to 280K for CP B Coefficients
Wednesday, October 19, 2005
2005/292 01:00:00 MCL MOD_BB_TEMP_SET_285K_B.2 BB Temp Set to 285K for CP B Coefficients
2005/292 04:00:00 MCL MOD_BB_TEMP_SET_290K_B.2 BB Temp Set to 290K for CP B Coefficients
2005/292 08:00:00 MCL MOD_BB_TEMP_SET_315K_B.2 BB Temp Set to 315K for CP B Coefficients
2005/292 08:00:30 MCL MOD_BB_DCYCLE_FULL.1 Set blackbody heater duty cycle to FULL
2005/292 12:00:00 MCL MOD_BB_TEMP_SET_270K_B.2 BB Temp Set to 270K for CP B Coefficients
2005/292 12:00:30 MCL MOD_BB_DCYCLE_THIRD.1 Set blackbody heater duty cycle to THIRD
Thursday, October 20, 2005
2005/293 08:00:00 MCL MOD_BB_TEMP_SET_285K_B.2 BB Temp Set to 285K for CP B Coefficients
Maneuvers:
The next Aqua MODIS Lunar Calibration Roll will be on DOY 2005/315 (November 11, 2005). The roll angle will be –7.6621 degrees. Data collect will be from 20:41:37-20:48:07.
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 246.5 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 82.9 of 500 hours
SRCA 1W Lamp #1: 509.9 of 5000 hours
SRCA 1W Lamp #2: 271.6 of 5000 hours
Solar Diffuser Door: 2438 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements