Mission Operations Days: 2006/007 to 2006/013
January 07, 2006 00:00:00 GMT to January 13, 2006 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, January 7, 2006
None
Sunday, January 8, 2006
None
Monday, January 9, 2006
Lunar Roll Maneuver (-6.9631 deg roll)
2006/009 13:59:02-14:45:06 MCL MOD_OA03_FR_DAY_RATE
2006/009 14:45:06-14:59:05 MCL MOD_OA03_FR_NIGHT_RATE (03:23 early)
2006/009 14:59:05-15:05:51 MCL MOD_OA08_ROLL_MAN
2006/009 15:41:18-16:27:22 MCL MOD_OA03_FR_DAY_RATE (03:23 late)
2006/009 16:27:22-17:16:49 MCL MOD_OA03_FR_NIGHT_RATE
2006/009 20:24:01-20:37:59 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B-Side
2006/009 22:02:55-22:16:53 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B-Side
Tuesday, January 10, 2006
2006/010 00:20:00-00:20:16 MCL MOD_SRCA_SETUP_NO_L2_L3_CC.2 SRCA setup activity using lamp #1 and lamp #4, and in constant current feedback mode.
2006/010 00:33:52-01:08:05 MCL MOD_OA19_SRCA_FULL_RAD.2 OA-19: SRCA Full Radiometric Calibration - B Side
Data Collect from 00:49:53-01:04:16.
Wednesday, January 11, 2006
None
Thursday, January 12, 2006
None
Friday, January 13, 2006
None
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for January will include triweekly SDSM, quarterly blackbody, and thrice yearly SRCA full spectral.
Saturday, January 14, 2006
2006/014 03:00:00 MCL MOD_BB_TEMP_SET_270K_B.2 BB Temp Set to 270K for CP B Coefficients
2006/014 21:00:00 MCL MOD_BB_TEMP_SET_280K_B.2 BB Temp Set to 280K for CP B Coefficients
Sunday, January 15, 2006
2006/015 01:00:00 MCL MOD_BB_TEMP_SET_285K_B.2 BB Temp Set to 285K for CP B Coefficients
2006/015 04:00:00 MCL MOD_BB_TEMP_SET_290K_B.2 BB Temp Set to 290K for CP B Coefficients
2006/015 08:00:00 MCL MOD_BB_TEMP_SET_315K_B.2 BB Temp Set to 315K for CP B Coefficients
2006/015 08:00:30 MCL MOD_BB_DCYCLE_FULL.1 Set blackbody heater duty cycle to FULL
2006/015 12:00:00 MCL MOD_BB_TEMP_SET_270K_B.2 BB Temp Set to 270K for CP B Coefficients
2006/015 12:00:30 MCL MOD_BB_DCYCLE_THIRD.1 Set blackbody heater duty cycle to THIRD
Monday, January 16, 2006
2006/016 08:00:00 MCL MOD_BB_TEMP_SET_285K_B.2 BB Temp Set to 285K for CP B Coefficients
Maneuvers:
The next Aqua MODIS Lunar Calibration will be on DOY 2006/039 (February 8, 2006). The roll angle will be –13.7904 degrees. Data collect will be from 05:17:59-05:24:29.
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 247.3 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 83.3 of 500 hours
SRCA 1W Lamp #1: 510.3 of 5000 hours
SRCA 1W Lamp #2: 271.6 of 5000 hours
Solar Diffuser Door: 2480 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements