Mission Operations Days: 2006/028 to 2006/034
January 28, 2006 00:00:00 GMT to February 03, 2006 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, January 28, 2006
None
Sunday, January 29, 2006
None
Monday, January 30, 2006
2006/030 20:43:59-20:57:57 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B-Side
2006/030 22:22:52-22:36:50 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B-Side
Tuesday, January 31, 2006
None
Wednesday, February 1, 2006
None
Thursday, February 2, 2006
None
Friday, February 3, 2006
None
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for February will include triweekly SDSM, monthly SRCA Full Radiometric, bimonthly PV Ecal, and quarterly SRCA Full Spatial.
Wednesday, February 8, 2006
Lunar Roll Maneuver (-13.7904 deg roll)
2006/039 04:20:22-05:06:26 MCL MOD_OA03_FR_DAY_RATE
2006/039 05:06:26-05:17:51 MCL MOD_OA03_FR_NIGHT_RATE (03:23 early)
2006/039 05:17:51-05:24:37 MCL MOD_OA08_ROLL_MAN
2006/039 06:02:39-06:48:43 MCL MOD_OA03_FR_DAY_RATE (03:23 late)
2006/039 06:48:43-07:38:10 MCL MOD_OA03_FR_NIGHT_RATE
Maneuvers:
The next Aqua MODIS Lunar Calibration will be on DOY 2006/039 (February 8, 2006). The roll angle will be –13.7904 degrees. Data collect will be from 05:17:59-05:24:29.
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 247.3 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 83.3 of 500 hours
SRCA 1W Lamp #1: 510.3 of 5000 hours
SRCA 1W Lamp #2: 271.6 of 5000 hours
Solar Diffuser Door: 2486 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements