Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, July 8, 2006
None
Sunday, July 9, 2006
None
Monday, July 10, 2006
None
Tuesday, July 11, 2006
None
Wednesday, July 12, 2006
None
Thursday, July 13, 2006
None
Friday, July 14, 2006
2006/195 13:25:22-13:26:11 Real-Time MOD_MEM_PM_DUMP('motor_constants',35,0,0,1,2)
2006/195 13:26:32-13:27:13 Real-Time MOD_MEM_PM_DUMP('motor_trigger_data',60,0,0,1,2)
2006/195 13:27:27-13:27:58 Real-Time MOD_MEM_PM_DUMP('motor_pos_when_hit',12,0,0,1,1)
2006/195 13:28:12-13:28:41 Real-Time MOD_MEM_PM_DUMP('door_data',12,0,0,1,1)
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for July will include triweekly SDSM, monthly SRCA full radiometric, and quarterly blackbody and PV Ecal.
Monday, July 17, 2006
2006/198 20:08:11-20:22:09 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B-Side
2006/198 21:47:04-22:01:02 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B-Side
Tuesday, July 18, 2006
2006/199 00:10:00-00:10:16 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1 SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode
2006/199 00:17:41-00:51:54 MCL MOD_OA19_SRCA_FULL_RAD.2 OA-19: SRCA Full Radiometric Calibration - B Side
Data Collect from 00:33:42-00:48:05.
2006/199 05:12:47-05:15:18 MCL MOD_OA27_PV_ECAL.1 OA-27: Photovoltaic bands electronics calibration
Wednesday, July 19, 2006
2006/200 03:00:00 MCL MOD_BB_TEMP_SET_270K_B.2 BB Temp Set to 270K for CP B Coefficients
2006/200 21:00:00 MCL MOD_BB_TEMP_SET_280K_B.2 BB Temp Set to 280K for CP B Coefficients
Thursday, July 20, 2006
2006/201 01:00:00 MCL MOD_BB_TEMP_SET_285K_B.2 BB Temp Set to 285K for CP B Coefficients
2006/201 04:00:00 MCL MOD_BB_TEMP_SET_290K_B.2 BB Temp Set to 290K for CP B Coefficients
2006/201 08:00:00 MCL MOD_BB_TEMP_SET_315K_B.2 BB Temp Set to 315K for CP B Coefficients
2006/201 08:00:30 MCL MOD_BB_DCYCLE_FULL.1 Set blackbody heater duty cycle to FULL
2006/201 12:00:00 MCL MOD_BB_TEMP_SET_270K_B.2 BB Temp Set to 270K for CP B Coefficients
2006/201 12:00:30 MCL MOD_BB_DCYCLE_THIRD.1 Set blackbody heater duty cycle to THIRD
Friday, July 21, 2006
2006/202 08:00:00 MCL MOD_BB_TEMP_SET_285K_B.2 BB Temp Set to 285K for CP B Coefficients
Maneuvers:
There will be no MODIS lunar calibration for the month of August.
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 251.1 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 85.1 of 500 hours
SRCA 1W Lamp #1: 511.0 of 5000 hours
SRCA 1W Lamp #2: 271.6 of 5000 hours
Solar Diffuser Door: 2528 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements