Mission Operations Days: 2006/217 to 2006/223 August 05, 2006 00:00:00 GMT to August 11, 2006 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode | ||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, August 5, 2006
None
Sunday, August 6, 2006
None
Monday, August 7, 2006
2006/219 20:25:48-20:39:46 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B-Side 2006/219 22:04:41-22:18:39 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B-Side 2006/219 22:50:00-22:50:16 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1 SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode 2006/219 22:56:29-23:30:42 MCL MOD_OA19_SRCA_FULL_RAD.2 OA-19: SRCA Full Radiometric Calibration - B Side Data Collect from 23:12:30-23:26:53.
Tuesday, August 8, 2006
2006/220 07:00:00-07:00:16 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1 SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode 2006/220 07:10:53-08:08:23 MCL MOD_OA23_SRCA_FULL_SPAT.2 OA-23: SRCA Full Spatial Calibration - B Side Data Collect from 07:27:10-07:57:56.
Wednesday, August 9, 2006
None
Thursday, August 10, 2006
None
Friday, August 11, 2006
None
This Week’s Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for August will include triweekly SDSM.
Maneuvers:
There will be no MODIS lunar calibration for the month of September.
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 251.8 of 500 hours SRCA 10W Lamp #2: 188.0 of 500 hours SRCA 10W Lamp #3: 205.7 of 500 hours SRCA 10W Lamp #4: 85.4 of 500 hours
SRCA 1W Lamp #1: 511.4 of 5000 hours SRCA 1W Lamp #2: 271.6 of 5000 hours
Solar Diffuser Door: 2540 of 3022 Movements Nadir Aperture Door: 1053 of 1316 Movements Space View Door: 632 of 1316 Movements