Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off
  • 10W Lamps - 1, 4 (functional)
  • 10W Lamps - 2, 3 (non-functional)
  • 1W Lamps - 1, 2 (functional)
Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week’s Completed MODIS Activities:

Saturday, September 2, 2006

None

Sunday, September 3, 2006

None

Monday, September 4, 2006

None

Tuesday, September 5, 2006

None

Wednesday, September 6, 2006

None

Thursday, September 7, 2006:

None

Friday, September 8, 2006

None

This Week’s Scheduled MODIS Activities Not Completed:

Thursday, September 7, 2006:

2006/250 16:23:26-16:24:26 MCL MOD_NAD_AND_SVD_TO_CLOSE.1 Closes the nadir and space view doors in the event that the spacecraft is not slewed back before s/c day.
This activity was not executed due to a nominal IAM.

Upcoming MODIS Events:

Calibrations for September will include triweekly SDSM, monthly SRCA full radiometric, and thrice yearly SRCA full spectral.

Tuesday, September 12, 2006:

2006/255 16:41:25-16:42:25 MCL MOD_NAD_AND_SVD_TO_CLOSE.1 Closes the nadir and space view doors in the event that the spacecraft is not slewed back before s/c day.

Maneuvers:

There will be no MODIS lunar calibration for the month of September.

Aqua inclination adjust maneuvers will be performed as follows:
2006/234 (Aug 22) Lo fidelity pointing accuracy: 15:52:35 – 16:29:42.
2006/241 (Aug 29) Lo fidelity pointing accuracy: 15:58:18 – 16:29:39.
2006/250 (Sept 7) Lo fidelity pointing accuracy: 15:51:20 – 16:22:41.
2006/255 (Sept 12)
2006/262 (Sept 19)
2006/269 (Sept 26)
2006/276 (Oct 3 Back up):

MODIS Anomalies:

None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/links/links.htm

Limited Life Item Status:

SRCA 10W Lamp #1: 251.8 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 85.4 of 500 hours

SRCA 1W Lamp #1: 511.4 of 5000 hours
SRCA 1W Lamp #2: 271.6 of 5000 hours

Solar Diffuser Door: 2546 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements