Mission Operations Days: 2006/294 to 2006/300 October 21, 2006 00:00:00 GMT to October 27, 2006 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode | ||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, October 21, 2006
None
Sunday, October 22, 2006
None
Monday, October 23, 2006
None
Tuesday, October 24, 2006
None
Wednesday, October 25, 2006
None
Thursday, October 26, 2006
None
Friday, October 27, 2006
None
This Week's Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for October will include triweekly SDSM, and quarterly blackbody and PV Ecal.
Monday, October 30, 2006 2006/303 21:31:28-21:45:26 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B-Side 2006/303 23:10:21-23:24:19 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B-Side
Wednesday, November 1, 2006 Lunar Roll Maneuver (-10.2152 deg roll) 2006/305 18:57:56 MCL MOD_OA03_FR_NIGHT_RATE (03:23 early) 2006/305 19:37:48-19:44:34 MCL MOD_OA08_ROLL_MAN 2006/305 19:53:57 MCL MOD_OA03_FR_DAY_RATE (03:23 late)
Maneuvers:
The next Aqua MODIS Lunar Calibration Roll will be on DOY 2006/305 (November 1, 2006). The roll angle will be -10.2152 degrees. Data collect will be from 19:37:56-19:44:26.
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 254.4 of 500 hours SRCA 10W Lamp #2: 188.0 of 500 hours SRCA 10W Lamp #3: 205.7 of 500 hours SRCA 10W Lamp #4: 86.7 of 500 hours
SRCA 1W Lamp #1: 511.6 of 5000 hours SRCA 1W Lamp #2: 271.6 of 5000 hours
Solar Diffuser Door: 2558 of 3022 Movements Nadir Aperture Door: 1053 of 1316 Movements Space View Door: 632 of 1316 Movements