Mission Operations Days: 2007/013 to 2007/019
January 13, 2007 00:00:00 GMT to January 19, 2007 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, January 13, 2007
2007/013 03:00:00 MCL MOD_BB_TEMP_SET_270K_B.2
BB Temp Set to 270K for CP B Coefficients
2007/013 21:00:00 MCL MOD_BB_TEMP_SET_280K_B.2
BB Temp Set to 280K for CP B Coefficients
Sunday, January 14, 2007
2007/014 01:00:00 MCL MOD_BB_TEMP_SET_285K_B.2
BB Temp Set to 285K for CP B Coefficients
2007/014 04:00:00 MCL MOD_BB_TEMP_SET_290K_B.2
BB Temp Set to 290K for CP B Coefficients
2007/014 08:00:00 MCL MOD_BB_TEMP_SET_315K_B.2
BB Temp Set to 315K for CP B Coefficients
2007/014 08:00:30 MCL MOD_BB_DCYCLE_FULL.1
Set blackbody heater duty cycle to FULL
2007/014 12:00:00 MCL MOD_BB_TEMP_SET_270K_B.2
BB Temp Set to 270K for CP B Coefficients
2007/014 12:00:30 MCL MOD_BB_DCYCLE_THIRD.1
Set blackbody heater duty cycle to THIRD
Monday, January 15, 2007
2007/015 08:00:00 MCL MOD_BB_TEMP_SET_285K_B.2
BB Temp Set to 285K for CP B Coefficients
Tuesday, January 16, 2007
None
Wednesday, January 17, 2007
None
Thursday, January 18, 2007
None
Friday, January 19, 2007
None
This Week's Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for January will include two triweekly SDSM, one monthly Lunar Calibration Roll, one monthly SRCA Full Radiometric, one quad-monthly SRCA Full Spectral, one quarterly Black Body heater cycle, and one quarterly PV Ecal.
Tuesday, January 23, 2007
2007/023 00:22:59-00:36:57 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side
2007/023 02:01:52-02:15:50 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open - B-Side
2007/023 03:00:00-03:00:16 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode
2007/023 03:03:46-03:34:11 MCL MOD_OA19_SRCA_FULL_RAD.2
OA-19: SRCA Full Radiometric Calibration - B Side
Data Collection 03:19:47-03:34:10 (centered on S/C Night)
S/C Night 03:09:49-03:43:30
Maneuvers:
The next Aqua MODIS Lunar Calibration Roll will be on DOY 2007/028 (January 28, 2007). The roll angle will be -12.0430 degrees. Data collect will be from 16:40:06-16:46:36.
The remaining four (4) Aqua Inclination Adjustment Maneuvers (IAMs) - deferred from 2006/262 and later - have been scheduled to occur in spring 2007. The current working dates are:
2007/073 - Wednesday, March 14, 2007
2007/087 - Wednesday, March 28, 2007
2007/101 - Wednesday, April 11, 2007
2007/114 - Tuesday, April 24, 2007
2007/128 - Tuesday, May 8, 2007 (backup date)
2007/135 - Tuesday, May 15, 2007 (backup date)
Additional details shall be provided as they become available.
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
Limited Life Item Status:
SRCA 10W Lamp #1: 255.2 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 87.1 of 500 hours
SRCA 1W Lamp #1: 512.0 of 5000 hours
SRCA 1W Lamp #2: 271.6 of 5000 hours
Solar Diffuser Door: 2582 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements