Mission Operations Days: 2007/097 to 2007/103
April 07, 2007 00:00:00 GMT to April 13, 2007 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, April 7, 2007
2007/097 03:00:00 MCL MOD_BB_TEMP_SET_270K_B.2
BB Temp Set to 270K for CP B Coefficients
2007/097 21:00:00 MCL MOD_BB_TEMP_SET_280K_B.2
BB Temp Set to 280K for CP B Coefficients
Sunday, April 8, 2007
2007/098 01:00:00 MCL MOD_BB_TEMP_SET_285K_B.2
BB Temp Set to 285K for CP B Coefficients
2007/098 04:00:00 MCL MOD_BB_TEMP_SET_290K_B.2
BB Temp Set to 290K for CP B Coefficients
2007/098 08:00:00 MCL MOD_BB_TEMP_SET_315K_B.2
BB Temp Set to 315K for CP B Coefficients
2007/098 08:00:30 MCL MOD_BB_DCYCLE_FULL.1
Set blackbody heater duty cycle to FULL
2007/098 12:00:00 MCL MOD_BB_TEMP_SET_270K_B.2
BB Temp Set to 270K for CP B Coefficients
2007/098 12:00:30 MCL MOD_BB_DCYCLE_THIRD.1
Set blackbody heater duty cycle to THIRD
Monday, April 9, 2007
2007/099 08:00:00 MCL MOD_BB_TEMP_SET_285K_B.2
BB Temp Set to 285K for CP B Coefficients
Tuesday, April 10, 2007:
None
Wednesday, April 11, 2007
None
Thursday, April 12, 2007
None
Friday, April 13, 2007
None
This Week's Scheduled MODIS Activities Not Completed:
Wednesday, April 11, 2007
(note: contingency activity for DOY 2007/101 IAM)
2007/101 15:35:09-15:36:09 MCL MOD_NAD_AND_SVD_TO_CLOSED.1
Closes the nadir and space view doors in the event that the spacecraft is not slewed back before s/c day.
Upcoming MODIS Events:
Calibrations for April will include one triweekly SDSM, one monthly SRCA Full Radiometric, one quarterly Black Body heater cycle, one quarterly PV Ecal, and one monthly Lunar Calibration Roll.
Monday, April 16, 2007
2007/106 20:49:39-21:03:37 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side
2007/106 22:28:33-22:42:31 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open - B-Side
Maneuvers:
The remaining four (4) Aqua Inclination Adjustment Maneuvers (IAMs) - deferred from 2006/262 and later - have been scheduled to occur in spring 2007. The current working dates are:
2007/073 - Wednesday, March 14, 2007, (16:14:00-16:46:00 yaw period)
2007/087 - Wednesday, March 28, 2007, (cancelled due to MMS anomaly)
2007/101 - Wednesday, April 11, 2007, (15:02:54-15:34:15 yaw period)
2007/114 - Tuesday, April 24, 2007
2007/128 - Tuesday, May 8, 2007 (backup date)
2007/135 - Tuesday, May 15, 2007 (backup date)
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov
Limited Life Item Status:
SRCA 10W Lamp #1: 256.0 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 87.5 of 500 hours
SRCA 1W Lamp #1: 512.4 of 5000 hours
SRCA 1W Lamp #2: 271.6 of 5000 hours
Solar Diffuser Door: 2606 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements