Skip to main content

MCST Banner Image

pm1weekly_2008-285_2008-291

Mission Operations Days: 2008/285 to 2008/291
October 11, 2008 00:00:00 GMT to October 17, 2008 00:00:00 GMT

Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off
  • 10W Lamps - 1, 4 (functional)
  • 10W Lamps - 2, 3 (non-functional)
  • 1W Lamps - 1, 2 (functional)
Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week's Completed MODIS Activities:

Saturday, October 11, 2008

None

Sunday, October 12, 2008

None

Monday, October 13, 2008

2008/287 20:33:35-20:47:33 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side
2008/287 21:30:00-21:30:16 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode
2008/287 21:35:07-22:05:32 MCL MOD_OA19_SRCA_FULL_RAD.2
OA-19: SRCA Full Radiometric Calibration - B Side
Data collection 21:51:08-22:05:31 (Centered on S/N Night)
S/C Night 21:41:58-22:14:43

Tuesday, October 14, 2008

None

Wednesday, October 15, 2008

Drag Make-up Maneuver
2008/289 15:00:00 MCL Aqua FOT begins 9:10 spacecraft yaw slew to +14.35 degrees
2008/289 15:20:00 MCL Aqua FOT begins 10 second delta-v burn
2008/289 15:50:00 MCL Aqua FOT begins 9:10 spacecraft yaw return slew to nominal pointing

Thursday, October 16, 2008

None

Friday, October 17, 2008

None

This Week's Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Calibrations for October will include: one screened SDSM, one monthly SRCA Full Radiometric, and one lunar roll.

Maneuvers:

None

MODIS Anomalies:

None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/

Limited Life Item Status:

SRCA 10W Lamp #1: 267.6 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 93.0 of 500 hours

SRCA 1W Lamp #1: 514.9 of 5000 hours
SRCA 1W Lamp #2: 274.88 of 5000 hours

Solar Diffuser Door: 2760 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements