Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off
  • 10W Lamps - 1, 4 (functional)
  • 10W Lamps - 2, 3 (non-functional)
  • 1W Lamps - 1, 2 (functional)
Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week's Completed MODIS Activities:

Saturday, January 17, 2009

None

Sunday, January 18, 2009

None

Monday, January 19, 2009

None

Tuesday, January 20, 2009

None

Wednesday, January 21, 2009

None

Thursday, January 22, 2009

None

Friday, January 23, 2009

None

This Week's Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Calibrations for January will include: two screened (DOY 005/026) and one open (DOY 026) SDSM, one monthly SRCA Full Radiometric (DOY 005), and one lunar roll (DOY 007).

Monday, January 26, 2009:

2009/026 20:26:28-20:40:26 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side
2009/026 22:05:21-22:19:19 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open - B-Side

Maneuvers:

None

MODIS Anomalies:

None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/

Limited Life Item Status:

SRCA 10W Lamp #1: 270.9 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 94.6 of 500 hours

SRCA 1W Lamp #1: 515.3 of 5000 hours
SRCA 1W Lamp #2: 274.88 of 5000 hours

Solar Diffuser Door: 2776 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements