Mission Operations Days: 2009/185 to 2009/191
July 04, 2009 00:00:00 GMT to July 10, 2009 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, July 4, 2009
None
Sunday, July 5, 2009
None
Monday, July 6, 2009
None
Tuesday, July 7, 2009
None
Wednesday, July 8, 2009
None
Thursday, July 9, 2009
None
Friday, July 10, 2009
None
This Week's Scheduled MODIS Activities Not Completed:
None
Upcoming MODIS Events:
Calibrations for July will include: one screened and one open SDSM (DOY 194), one monthly SRCA Full Radiometric (DOY 201), one PV Eval (DOY 200), one BB Cycle (DOY 206-208), and one lunar roll (DOY 183).
Monday, July 13, 2009:
2009/194 21:27:25-21:41:23 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side
2009/194 23:06:17-23:20:15 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open - B-Side
Maneuvers:
None
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/
Limited Life Item Status:
SRCA 10W Lamp #1: 277.2 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 97.7 of 500 hours
SRCA 1W Lamp #1: 516.1 of 5000 hours
SRCA 1W Lamp #2: 274.88 of 5000 hours
Solar Diffuser Door: 2808 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements