Mission Operations Days: 2010/338 through 2010/344
December 04, 2010 00:00:00 GMT to December 10, 2010 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
| PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
|---|---|---|
| Component | State(s) | Comment |
| Blackbody | A Off; B On (285K) | Nominal Science Mode |
| Calibration Electronics | A Off; B On | Nominal Science Mode |
| Control Processor | A Off; B On | Nominal Science Mode |
| Nadir Door | Unlatched, Open | Nominal Science Mode |
| Space View Door | Unlatched, Open | Nominal Science Mode |
| Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
| FDDI Formatter | A Off; B On | Nominal Science Mode |
| FDDI Port | A Off; B On | Nominal Science Mode |
| FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
| Format Processor | A Off; B On | Nominal Science Mode |
| Power Supplies | #1 Off, #2 On | Nominal Science Mode |
| PV VIS FPA | A Off; B On | Nominal Science Mode |
| PV NIR FPA | A Off; B On | Nominal Science Mode |
| PV SMIR FPA | A Off; B On | Nominal Science Mode |
| PV LWIR FPA | A Off; B On | Nominal Science Mode |
| PC LWIR FPA | A Off; B On | Nominal Science Mode |
| RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
| RC LWIR FPA Heater | Off | Nominal Science Mode |
| RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
| Scan Assembly | A Off; B On | Nominal Science Mode |
| SDSM | Off | Nominal Science Mode |
| SRCA | Off
|
Nominal Science Mode |
| PS1 Survival Heaters | Enabled | Nominal Science Mode |
| PS2 Survival Heaters | Enabled | Nominal Science Mode |
| Timing Generator | A Off; B On | Nominal Science Mode |
| Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
| Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, December 04, 2010
None
Sunday, December 05, 2010
2010/339 20:49:02-20:51:33 MCL MOD_OA27_PV_ECAL.1
OA-27: Photovoltaic bands electronics calibration
Centered on S/C maximum latitude at 20:50:17.
Monday, December 06, 2010
2010/340 21:26:11-21:26:27 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current
feedback mode
2010/340 21:29:11-21:59:36 MCL MOD_OA19_SRCA_FULL_RAD.2
OA-19: SRCA Full Radiometric Calibration - B Side
Data collection 21:45:12-21:59:35 (Centered on S/N Night)
S/C Night 21:35:54-22:08:54.
Tuesday, December 07, 2010
None
Wednesday, December 08, 2010
None
Thursday, December 09, 2010
None
Friday, December 10, 2010
None
This Week's Scheduled MODIS Activities Not Completed:
None
This Month's Upcoming MODIS Events:
Calibrations for December will include a PV Ecal (DOY 339), an SRCA Radiometric (DOY 340), a Black Body Cycle (DOY 345-348), a Lunar Roll (DOY 350), and an SDSM Screened (DOY 354).
Maneuvers:
None
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/
Limited Life Item Status:
SRCA 10W Lamp #1: 289.2 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 103.4 of 500 hours
SRCA 1W Lamp #1: 520.5 of 5000 hours
SRCA 1W Lamp #2: 274.9 of 5000 hours
Solar Diffuser Door: 2908 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements