Skip to main content

MCST Banner Image

pm1weekly_2011-134_2011-154

Mission Operations Days: 2011/134 through 2011/154
May 14, 2011 00:00:00 GMT to June 03, 2011 00:00:00 GMT

Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off
  • 10W Lamps - 1, 4 (functional)
  • 10W Lamps - 2, 3 (non-functional)
  • 1W Lamps - 1, 2 (functional)
Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week's Completed MODIS Activities:

Saturday, May 14, 2011

None

Sunday, May 15, 2011

None

Monday, May 16, 2011

2011/136 21:23:02-21:37:00 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side
2011/136 23:01:56-23:15:54 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open - B-Side

Tuesday, May 17, 2011

None

Wednesday, May 18, 2011

None

Thursday, May 19, 2011

None

Friday, May 20, 2011

None

Saturday, May 21, 2011

None

Sunday, May 22, 2011

2011/142 19:59:14-20:01:45 MCL MOD_OA27_PV_ECAL.1
OA-27: Photovoltaic bands electronics calibration
Centered on S/C maximum latitude at 20:00:30.

Monday, May 23, 2011

2011/143 20:49:10-20:49:26 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current
feedback mode
2011/143 20:52:10-22:34:52 MCL MOD_OA19_SRCA_FULL_RAD.2
OA-19: SRCA Full Radiometric Calibration - B Side
Data collection 21:08:11-21:22:34 (Centered on S/N Night)
S/C Night 20:58:22-21:32:24.

Tuesday, May 24, 2011

None

Wednesday, May 25, 2011

None

Thursday, May 26, 2011

None

Friday, May 27, 2011

None

Saturday, May 28, 2011

2011/148 03:00:00 MCL MOD_BB_TEMP_SET_270K_B.2
BB Temp Set to 270K for CP B Coefficients
2011/148 21:00:00 MCL MOD_BB_TEMP_SET_280K_B.2
BB Temp Set to 280K for CP B Coefficients

Sunday, May 29, 2011

2011/149 01:00:00 MCL MOD_BB_TEMP_SET_285K_B.2
BB Temp Set to 285K for CP B Coefficients
2011/149 04:00:00 MCL MOD_BB_TEMP_SET_290K_B.2
BB Temp Set to 290K for CP B Coefficients
2011/149 08:00:00 MCL MOD_BB_TEMP_SET_315K_B.2
BB Temp Set to 315K for CP B Coefficients
2011/149 08:00:30 MCL MOD_BB_DCYCLE_FULL.1
Set blackbody heater duty cycle to FULL
2011/149 12:00:00 MCL MOD_BB_TEMP_SET_270K_B.2
BB Temp Set to 270K for CP B Coefficients
2011/149 12:00:30 MCL MOD_BB_DCYCLE_THIRD.1
Set blackbody heater duty cycle to THIRD

Monday, May 30, 2011

2011/150 08:00:00 MCL MOD_BB_TEMP_SET_285K_B.2
BB Temp Set to 285K for CP B Coefficients

Tuesday, May 31, 2011

None

Wednesday, June 01, 2011

None

Thursday, June 02, 2011

None

Friday, June 03, 2011

None

This Week's Scheduled MODIS Activities Not Completed:

None

This Month's Upcoming MODIS Events:

Calibrations for May and June will include an SDSM Screened (DOY 128), a Lunar Roll (DOY 133), an SDSM Screened (DOY 136), an SDSM Opened (DOY 136), a PV Ecal (DOY 142), an SRCA Radiometric (DOY 143), a Black Body Cycle (DOY 148), an SDSM Screened (DOY 157), a Lunar Roll (DOY 162), an SRCA Radiometric (DOY 164), an SRCA Spatial (DOY 177), and an SDSM Opened (DOY 178).

Monday, June 06, 2011

2011/157 20:03:13-20:17:11 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side

Maneuvers:

There will be an Aqua Drag Make Up Maneuver (DMU) # 42 on DOY 159 (06/08/2011). The maneuver start time is set for 159/13:40:00 and the maneuver end time is set for 159/15:24:10. The maximum yaw angle for this maneuver will reach 14.35 degrees and the preliminary burn duration is 20 seconds. The preliminary loss of pointing accuracy times are 159/13:40:00 - 15:39:10.

MODIS Anomalies:

None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/

Limited Life Item Status:

SRCA 10W Lamp #1: 291.9 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 104.2 of 500 hours

SRCA 1W Lamp #1: 523.1 of 5000 hours
SRCA 1W Lamp #2: 274.9 of 5000 hours

Solar Diffuser Door: 2938 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements