Mission Operations Days: 2011/302 through 2011/308
October 29, 2011 00:00:00 GMT to November 04, 2011 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, October 29, 2011
None
Sunday, October 30, 2011
None
Monday, October 31, 2011
2011/304 20:23:12-20:37:10 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side
2011/304 22:02:05-22:16:03 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open - B-Side
Tuesday, November 01, 2011
None
Wednesday, November 02, 2011
None
Thursday, November 03, 2011
None
Friday, November 04, 2011
None
This Week's Scheduled MODIS Activities Not Completed:
None
This Month's Upcoming MODIS Events:
Calibrations for November will include a PV Ecal (DOY 310), an SRCA Radiometric (DOY 311), a Black Body Cycle (DOY 316-318), and an SDSM Screened (DOY 325).
Sunday, November 06, 2011
2011/310 20:48:15-20:50:46 MCL MOD_OA27_PV_ECAL.1
OA-27: Photovoltaic bands electronics calibration.
Centered on S/C maximum latitude at 20:49:30.
Monday, November 07, 2011
2011/311 21:27:18-21:27:34 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current
feedback mode
2011/311 21:30:18-22:00:43 MCL MOD_OA19_SRCA_FULL_RAD.2
OA-19: SRCA Full Radiometric Calibration - B Side
Data collection 21:46:19-22:00:42 (Centered on S/N Night)
S/C Night 21:37:11-22:09:52.
Saturday, November 12, 2011
2011/316 03:00:00 MCL MOD_BB_TEMP_SET_270K_B.2
BB Temp Set to 270K for CP B Coefficients
2011/316 21:00:00 MCL MOD_BB_TEMP_SET_280K_B.2
BB Temp Set to 280K for CP B Coefficients
Sunday, November 13, 2011
2011/317 01:00:00 MCL MOD_BB_TEMP_SET_285K_B.2
BB Temp Set to 285K for CP B Coefficients
2011/317 04:00:00 MCL MOD_BB_TEMP_SET_290K_B.2
BB Temp Set to 290K for CP B Coefficients
2011/317 08:00:00 MCL MOD_BB_TEMP_SET_315K_B.2
BB Temp Set to 315K for CP B Coefficients
2011/317 08:00:30 MCL MOD_BB_DCYCLE_FULL.1
Set blackbody heater duty cycle to FULL
2011/317 12:00:00 MCL MOD_BB_TEMP_SET_270K_B.2
BB Temp Set to 270K for CP B Coefficients
2011/317 12:00:30 MCL MOD_BB_DCYCLE_THIRD.1
Set blackbody heater duty cycle to THIRD
Monday, November 14, 2011
2011/318 08:00:00 MCL MOD_BB_TEMP_SET_285K_B.2
BB Temp Set to 285K for CP B Coefficients
Maneuvers:
There will be an Aqua Debris Avoidance Maneuver (DAM) # 54 on DOY 312 (11/08/2011). The maneuver start time is set for 312/02:45:00 and the maneuver end time is set for 312/03:34:10. Preliminary loss of pointing accuracy times are 312/02:45:00 - 03:49:10.
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/
Limited Life Item Status:
SRCA 10W Lamp #1: 293.9 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 104.8 of 500 hours
SRCA 1W Lamp #1: 523.8 of 5000 hours
SRCA 1W Lamp #2: 274.9 of 5000 hours
Solar Diffuser Door: 2976 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements